Quick answers
What is this project?
Indraprastha Gas Limited,New Delhi project for Laying of 8" NB Carbon Steel Underground Gas Pipeline along various roads is an approved road project in Akhtiyarpur, Garhmukteshwar, Hapur, Uttar Pradesh. The site covers 2.2 acres.
Who is building it?
The applicant is Indraprastha Gas Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 24 Sept 2026), as of 27 Nov 2026.
Where is it?
In Akhtiyarpur, Garhmukteshwar, Hapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.5 crore; a site of 2.2 acres and 2.2 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 15 May 2024.
Project details
| Official title | Indraprastha Gas Limited,New Delhi project for Laying of 8" NB Carbon Steel Underground Gas Pipeline along various roads in district HAPUR |
|---|---|
| Status | Forest land use approved |
| Status since | 24 Sept 2026 |
| Application filed | 15 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Indraprastha Gas Limited |
| Land area | 2.2 acres (0.9 ha) |
| Forest land | 2.2 acres (0.9 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Akhtiyarpur |
| Taluk / tehsil | Garhmukteshwar |
| District | Hapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05121 |
In context
7 applications in Hapur since January 2022 are in the same category (Roads & highways): 3 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Akhtiyarpur, Garhmukteshwar, Hapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.855 Ha. of Protected Forest Land for proposed IGL Laying of 8"… — more information requested, 2.9 km away
- NOC Wildlife Clearance Of Proposed Private Land In State Animal Barasingha… — more information requested, 4.4 km away
- NOC Wildlife Clearance of Proposed Non-Forest Land In State Animal Barasingha… — more information requested, 4.4 km away
- Diversion of 0.099 ha of Protected Forest Land under approach road for… — forest land use approved, 4.5 km away
- NOC Wildlife Clearance For Poultry Farming For Eggs & Button Mushroom Grown Of… — more information requested, 4.8 km away
- NOC Wildlife Clearance Of Proposed Eco Resort Of M/S Mulberry Estate Situated… — under wildlife review, 5 km away
- Allabuxpur Soil Mining Project — under environmental review, 5.6 km away
- Allabuxpur Soil Mining Project — under environmental review, 5.7 km away
More from Indraprastha Gas Limited in Hapur
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To… — more information requested
- Laying of 8" NB Carbon Steel Gas Pipeline in favour of M/S Indarprastha Gas… — under wildlife review
- Diversion of 0.150 Ha PF LAND in favour of M/S Indarprastha Gas Ltd. New Delhi… — lapsed
- Diversion of 0.10 ha of Protected Forest Land for proposed permission for… — forest land use approved
- Diversion of 0.150 Ha. of Protected Forest Land for proposed IGL Laying of 125… — in-principle approval, conditions pending
- Diversion of 0.855 Ha. of Protected Forest Land for proposed IGL Laying of 8"… — more information requested
9 Indraprastha Gas projects in Hapur
All 84 Indraprastha Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.