Diversion of 0.855 Ha. of Protected Forest Land for proposed IGL Laying of 8" NB Carbon Steel Gas Pipeline along Kuchesar Road Chopla, Sikheda, Simbhaoli, Buxar, Saroorpur, Badarkha, NH Toll Plaza (Old NH 24) from Chainage Km 70+000 to Km 90+000 (Total Length 19 Km) under Hapur Forest Division

Diversion of 0.855 Ha. of Protected Forest Land for proposed IGL Laying of 8" NB Carbon Steel Gas Pipeline along Kuchesar Road Chopla, Sikheda, Simbhaoli, Buxar, Saroorpur, Badarkha, NH Toll Plaza (Old NH 24) from Chainage Km 70+000 to Km 90+000 (Total Length 19 Km) under Hapur Forest Division is a proposed pipeline project in Saroorpur, Garhmukteshwar, Hapur, Uttar Pradesh. The site covers 2.1 acres. Its stated project cost is ₹4.9 crore. As of 27 Nov 2026, its status is “More information requested” (since 21 Aug 2026).

See it on the live map All projects in Hapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 0.855 Ha. of Protected Forest Land for proposed IGL Laying of 8" NB Carbon Steel Gas Pipeline along Kuchesar Road Chopla, Sikheda, Simbhaoli, Buxar, Saroorpur, Badarkha, NH Toll Plaza (Old NH 24) from Chainage Km 70+000 to Km 90+000 (Total Length 19 Km) under Hapur Forest Division is a proposed pipeline project in Saroorpur, Garhmukteshwar, Hapur, Uttar Pradesh. The site covers 2.1 acres.

Who is building it?

The applicant is Indraprastha Gas Limited.

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Saroorpur, Garhmukteshwar, Hapur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹4.9 crore; a site of 2.1 acres and 2.1 acres (0.9 ha) of forest land.

When was it filed?

The application was filed on 5 Aug 2023.

Project details

Official titleDiversion of 0.855 Ha. of Protected Forest Land for proposed IGL Laying of 8" NB Carbon Steel Gas Pipeline along Kuchesar Road Chopla, Sikheda, Simbhaoli, Buxar, Saroorpur, Badarkha, NH Toll Plaza (Old NH 24) from Chainage Km 70+000 to Km 90+000 (Total Length 19 Km) under Hapur Forest Division in Tehsil & District Hapur in Uttar Pradesh State
StatusMore information requested
Status since21 Aug 2026
Application filed5 Aug 2023
Approval soughtForest land use
Application typeNew project
SectorPipelines
ApplicantIndraprastha Gas Limited
Land area2.1 acres (0.9 ha)
Forest land2.1 acres (0.9 ha)
Project cost₹4.9 crore
Village / localitySaroorpur
Taluk / tehsilGarhmukteshwar
DistrictHapur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-06979

In context

6 applications in Hapur since January 2022 are in the same category (Pipelines): 1 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Saroorpur, Garhmukteshwar, Hapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Indraprastha Gas Limited in Hapur

9 Indraprastha Gas projects in Hapur
All 84 Indraprastha Gas projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.