Under wildlife reviewPipelines · Hapur, Uttar Pradesh

Laying of 8" NB Carbon Steel Gas Pipeline in favour of M/S Indarprastha Gas Ltd. New Delhi along NH-9 Toll Plaza (old NH24) to Brijghat from Chainage Km 90+000 to Km 93+000 (Total Length 03 Km) Proposed pipeline is passing through the Eco Sensitive Zone of Hastinapur Wild Life Sanctuary approx 1.85 Km

Laying of 8" NB Carbon Steel Gas Pipeline in favour of M/S Indarprastha Gas Ltd. New Delhi along NH-9 Toll Plaza (old NH24) to Brijghat from Chainage Km 90+000 to Km 93+000 (Total Length 03 Km) Proposed pipeline is passing through the Eco Sensitive Zone of Hastinapur Wild Life Sanctuary approx 1.85 Km is a proposed pipeline project in Bagadpur, Garhmukteshwar, Hapur, Uttar Pradesh. The site covers 0.2 acres. Its stated project cost is ₹30 lakh. As of 27 Nov 2026, its status is “Under wildlife review” (since 13 Aug 2024).

See it on the live map All projects in Hapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Laying of 8" NB Carbon Steel Gas Pipeline in favour of M/S Indarprastha Gas Ltd. New Delhi along NH-9 Toll Plaza (old NH24) to Brijghat from Chainage Km 90+000 to Km 93+000 (Total Length 03 Km) Proposed pipeline is passing through the Eco Sensitive Zone of Hastinapur Wild Life Sanctuary approx 1.85 Km is a proposed pipeline project in Bagadpur, Garhmukteshwar, Hapur, Uttar Pradesh. The site covers 0.2 acres.

Who is building it?

The applicant is Indraprastha Gas Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.

Where is it?

In Bagadpur, Garhmukteshwar, Hapur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹30 lakh and a site of 0.2 acres.

When was it filed?

The application was filed on 13 Aug 2024.

Project details

Official titleLaying of 8" NB Carbon Steel Gas Pipeline in favour of M/S Indarprastha Gas Ltd. New Delhi along NH-9 Toll Plaza (old NH24) to Brijghat from Chainage Km 90+000 to Km 93+000 (Total Length 03 Km) Proposed pipeline is passing through the Eco Sensitive Zone of Hastinapur Wild Life Sanctuary approx 1.85 Km in Hapur District of Uttar Pradesh State.
StatusUnder wildlife review
Status since13 Aug 2024
Application filed13 Aug 2024
Approval soughtWildlife review
Application typeNew project
SectorPipelines
ApplicantIndraprastha Gas Limited
Land area900 m²
Project cost₹30 lakh
Village / localityBagadpur
Taluk / tehsilGarhmukteshwar
DistrictHapur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-07345

In context

6 applications in Hapur since January 2022 are in the same category (Pipelines): 1 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.

17 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bagadpur, Garhmukteshwar, Hapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Indraprastha Gas Limited in Hapur

9 Indraprastha Gas projects in Hapur
All 84 Indraprastha Gas projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.