What is Developing? Open the mapMap

Forest land use approvedPipelines · Hapur, Uttar Pradesh

Diversion of 0.10 ha of Protected Forest Land for proposed permission for laying 8" & 4" Carbon Steel Gas Pipeline BPCL Petrol Pump from Meerut - Hapur Road Chainage Km 28.500 to Km 29.500 (Total Length 1.0 Km) under Hapur Forest Division

Diversion of 0.10 ha of Protected Forest Land for proposed permission for laying 8" & 4" Carbon Steel Gas Pipeline BPCL Petrol Pump from Meerut - Hapur Road Chainage Km 28.500 to Km 29.500 (Total Length 1.0 Km) under Hapur Forest Division is an approved pipeline project in Asaura, Hapur, Uttar Pradesh. The site covers 0.2 acres. Its stated project cost is ₹1 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 4 Nov 2026).

See it on the live map All projects in Hapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 0.10 ha of Protected Forest Land for proposed permission for laying 8" & 4" Carbon Steel Gas Pipeline BPCL Petrol Pump from Meerut - Hapur Road Chainage Km 28.500 to Km 29.500 (Total Length 1.0 Km) under Hapur Forest Division is an approved pipeline project in Asaura, Hapur, Uttar Pradesh. The site covers 0.2 acres.

Who is building it?

The applicant is Indraprastha Gas Limited.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 4 Nov 2026), as of 27 Nov 2026.

Where is it?

In Asaura, Hapur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1 crore; a site of 0.2 acres and 1,000 m² of forest land.

When was it filed?

The application was filed on 8 Nov 2023.

Project details

Official titleDiversion of 0.10 ha of Protected Forest Land for proposed permission for laying 8" & 4" Carbon Steel Gas Pipeline BPCL Petrol Pump from Meerut - Hapur Road Chainage Km 28.500 to Km 29.500 (Total Length 1.0 Km) under Hapur Forest Division in Asauda Village, Hapur Tehsil & Hapur District in Uttar Pradesh State
StatusForest land use approved
Status since4 Nov 2026
Application filed8 Nov 2023
Approval soughtForest land use
Application typeNew project
SectorPipelines
ApplicantIndraprastha Gas Limited
Land area1,000 m²
Forest land1,000 m²
Project cost₹1 crore
Village / localityAsaura
Taluk / tehsilHapur
DistrictHapur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-06989

In context

6 applications in Hapur since January 2022 are in the same category (Pipelines): 1 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Asaura, Hapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Indraprastha Gas Limited in Hapur

9 Indraprastha Gas projects in Hapur
All 84 Indraprastha Gas projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.