Quick answers
What is this project?
Protected Forest Land proposed for diversion for Entry/Exit approach to Indian Oil Corporation Limited Retail Outlet on NH-27 (Old NH-25) in Km. 1461-1463 (Ch. 1461.975-1462.015 RHS) at Gata No. 699 Mi., Village: Sesa, Tehsil-Moth, District: Jhansi (Uttar Pradesh) is a lapsed fuel station in Sesa, Moth, Jhansi, Uttar Pradesh. The site covers 1 acre.
Who is building it?
The applicant is Hemant Kumar.
Has it been approved?
No. The application was lapsed on 5 Dec 2025, so it is no longer under consideration.
Where is it?
In Sesa, Moth, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹45 lakh; a site of 1 acre and 2,350 m² of forest land.
When was it filed?
The application was filed on 3 Nov 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 5 Dec 2025 |
| Application filed | 3 Nov 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hemant Kumar |
| Land area | 1 acres (0.4 ha) |
| Forest land | 2,350 m² |
| Project cost | ₹45 lakh |
| Village / locality | Sesa |
| Taluk / tehsil | Moth |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05320 |
In context
31 applications in Jhansi since January 2022 are in the same category (Fuel stations): 13 approved, 5 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 22 months from filing to approval. At 1 acre, this one is larger than 52% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sesa, Moth, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land proposed for diversion for Entry/Exit approach to… — lapsed, 1.9 km away
- Laying of 24 F of Cable From Moth Bsnl Telephone Exchange to Ait Bsnl… — lapsed, 2.7 km away
- Laying of 24 F of Cable From Moth Bsnl Telephone Exchange to Ait Bsnl… — lapsed, 2.7 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River… — lapsed, 4 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River… — cleared for impact study, 4 km away
- Transfer of Environmental Clearance for Sand/Morrum Mining project from Arazi… — lapsed, 4.1 km away
- Sand/Moram Mining Project at Betwa River Bed, Gata No. 2118, 2119, Khand No.… — lapsed, 4.4 km away
- River Bed Sand/ Morrum Mining — environmental approval granted, 4.6 km away
More from Hemant Kumar in Jhansi
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.