Quick answers
What is Amended BharatNet Project (Alampur Jafrabad-Bareilly)?
Amended BharatNet Project (Alampur Jafrabad-Bareilly) is a lapsed telecom project in Alampur Zafrabad, Aonla, Bareilly, Uttar Pradesh. The site covers 1,508.6 acres.
Who is building it?
The applicant is Rail Vikas Nigam Limited (RVNL).
Has it been approved?
No. The application was lapsed on 14 Jun 2026, so it is no longer under consideration.
Where is it?
In Alampur Zafrabad, Aonla, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹66 lakh; a site of 1,508.6 acres and 3,190 m² of forest land.
When was it filed?
The application was filed on 14 May 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 14 Jun 2026 |
| Application filed | 14 May 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Rail Vikas Nigam Limited (RVNL) |
| Land area | 1,508.6 acres (610.5 ha) |
| Forest land | 3,190 m² |
| Project cost | ₹66 lakh |
| Village / locality | Alampur Zafrabad |
| Taluk / tehsil | Aonla |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07108 |
In context
8 applications in Bareilly since January 2022 are in the same category (Telecom): 1 approved, 0 filed or under review, and 7 withdrawn, lapsed or rejected.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Alampur Zafrabad, Aonla, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Reserved Forest Land to be diverted for Laying of Natural Gas… — under forest review, 1.3 km away
- Proposed Reserved Forest Land to be re-diverted for Laying of Natural Gas… — lapsed, 1.3 km away
- Proposed Reserved Forest Land to be diverted for Widening & Upgradation of… — more information requested, 1.3 km away
- Increase in On-Stream Days of Existing Ammonia and Urea Plants and Product Mix… — initial checks, 1.4 km away
- Manufacturing of Nano-DAP in Existing Nano Fertilizer Plant under Product Mix — initial checks, 1.4 km away
- Modernization of Nano Fertilizer Plant, Aonla Unit at IFFCO Aonla, Paul Pothen… — environmental approval granted, 1.4 km away
- Protected Forest for Non-Forest Purpose for Laying of Gas Pipe Line along… — in-principle approval, conditions pending, 6.1 km away
- Amended Bharat Net — lapsed, 6.2 km away
More from Rail Vikas Nigam Limited (RVNL) in Bareilly
- Amended BharatNet Project (Fatehganj West-Bareilly) — lapsed
- Amended BharatNet Project (Kyara-Bareilly) — lapsed
- Amended Bharatnet Project (Faridpur-Bareilly) — lapsed
- Amended BharatNet Project (Damkhauda-Bareilly) — lapsed
- Amended Bharat Net — lapsed
6 Rail Vikas Nigam (RVNL) projects in Bareilly
All 82 Rail Vikas Nigam (RVNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.