Quick answers
What is this project?
Dedicated C2/C3 pipeline from GAIL Vijaipur to GAIL Pata - Uttar Pradesh Section is a proposed pipeline project in Deguwan, Moth, Jhansi, Uttar Pradesh. The site covers 402.3 acres.
Who is building it?
The applicant is GAIL (India) Limited (GAIL).
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Deguwan, Moth, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1,398 crore; a site of 402.3 acres and 4.8 acres (1.9 ha) of forest land.
When was it filed?
The application was filed on 27 Nov 2025.
Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 12 Jul 2026 |
| Application filed | 27 Nov 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | GAIL (India) Limited (GAIL) |
| Land area | 402.3 acres (162.8 ha) |
| Forest land | 4.8 acres (1.9 ha) |
| Project cost | ₹1,398 crore |
| Village / locality | Deguwan |
| Taluk / tehsil | Moth |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06876 |
Where it is
Deguwan, Moth, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land proposed for diversion for Entry/Exit approach to… — lapsed, 9.3 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — lapsed, 9.6 km away
- Laying of 24 F of Cable From Moth Bsnl Telephone Exchange to Ait Bsnl… — lapsed, 12.3 km away
- Laying of 24 F of Cable From Moth Bsnl Telephone Exchange to Ait Bsnl… — lapsed, 12.3 km away
- River Bed Sand/ Morrum Mining — environmental approval granted, 13.1 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River… — lapsed, 13.7 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River… — cleared for impact study, 13.7 km away
- Transfer of Environmental Clearance for Sand/Morrum Mining project from Arazi… — lapsed, 13.7 km away
More from GAIL (India) Limited (GAIL) in Jhansi
All 86 GAIL (India) (GAIL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.