Quick answers
What is this project?
Diversion of Forest Land for Construction of Guide Bund at Sukhro River by NHAI is an approved road project in Sabalgarh Reserved Forest, Najibabad, Bijnor, Uttar Pradesh. The site covers 4.2 acres.
Who is building it?
The applicant is National Highways Authority of India (NHAI).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 15 Jul 2026), as of 27 Nov 2026.
Where is it?
In Sabalgarh Reserved Forest, Najibabad, Bijnor, Uttar Pradesh.
How big is it?
It has a stated cost of ₹691.7 crore; a site of 4.2 acres and 4.2 acres (1.7 ha) of forest land.
When was it filed?
The application was filed on 20 May 2025.
Project details
| Official title | Diversion of Forest Land for Construction of Guide Bund at Sukhro River Under the Project Development of Section of NH-119 From 2-Lane to 2-Lane With Paved Shoulder (From Km 120+900 to Km 137+760) Under Bharatmala Pariyojana (Lot-4/Package-2) in the State of Uttar Pradesh |
|---|---|
| Status | Forest land use approved |
| Status since | 15 Jul 2026 |
| Application filed | 20 May 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | National Highways Authority of India (NHAI) |
| Land area | 4.2 acres (1.7 ha) |
| Forest land | 4.2 acres (1.7 ha) |
| Project cost | ₹691.7 crore |
| Village / locality | Sabalgarh Reserved Forest |
| Taluk / tehsil | Najibabad |
| District | Bijnor |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06151 |
In context
22 applications in Bijnor since January 2022 are in the same category (Roads & highways): 8 approved, 10 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 4.2 acres, this one is smaller than 79% of them.
Where it is
Sabalgarh Reserved Forest, Najibabad, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Proposed Project of Mining of RBM (Mixed form) on Riverbed of Malin River"… — environmental approval granted, 6.9 km away
- "R.B.M. (In mix form) Mining" Project at Gata No.- 413, 414, 221, 222, 223,… — environmental approval granted, 8.3 km away
- Sundarwali Sand Mining Project, Located on river bed of Khoh River (1.960 ha) — environmental approval granted, 9.7 km away
- Mirpur Durg RBM Mining Project, Proponent Team Growth Private Limited, Prateek… — environmental approval granted, 12.4 km away
- Proposed Project of "Sand- Bajri-Boulders in Mixed State (RBM) Mine" located… — environmental approval granted, 14.6 km away
- Proposed Project of "Sand- Bajri-Boulders in Mixed State (RBM) Mine" located… — cleared for impact study, 14.6 km away
- "R.B.M. [Sand, Bajri, Boulder (In Mix Form)] Mining" Project at Gata No.- 400… — environmental approval granted, 15 km away
- "R.B.M. [Sand, Bajri, Boulder (In Mix Form)] Mining" Project at Gata No.- 400… — cleared for impact study, 15 km away
6 National Highways Authority of India (NHAI) projects in Bijnor
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.