What is Developing? Open the mapMap

Environmental approval grantedMining · Bijnor, Uttar Pradesh

"Proposed Project of Mining of RBM (Mixed form) on Riverbed of Malin River" located at Gata No. 193, Mining Lease Area 1.34 ha., Village – Biruwala, Tehsil- Najibabad, District- Bijnor, Uttar Pradesh .M/s Team Growth Private Limited Director- Shri Prateek Bhatnagar

"Proposed Project of Mining of RBM (Mixed form) on Riverbed of Malin River" located at Gata No. 193, Mining Lease Area 1.34 ha., Village – Biruwala, Tehsil- Najibabad, District- Bijnor, Uttar Pradesh .M/s Team Growth Private Limited Director- Shri Prateek Bhatnagar is an approved mining project in Biruwala Farm, Najibabad, Bijnor, Uttar Pradesh. The site covers 3.3 acres. Its stated project cost is ₹85 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 28 May 2025).

See it on the live map All projects in Bijnor

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Proposed Project of Mining of RBM (Mixed form) on Riverbed of Malin River" located at Gata No. 193, Mining Lease Area 1.34 ha., Village – Biruwala, Tehsil- Najibabad, District- Bijnor, Uttar Pradesh .M/s Team Growth Private Limited Director- Shri Prateek Bhatnagar is an approved mining project in Biruwala Farm, Najibabad, Bijnor, Uttar Pradesh. The site covers 3.3 acres.

Who is building it?

The applicant is Prateek Pramod Bhatnagar.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 28 May 2025), as of 27 Nov 2026.

Where is it?

In Biruwala Farm, Najibabad, Bijnor, Uttar Pradesh.

How big is it?

It has a stated cost of ₹85 lakh and a site of 3.3 acres.

When was it filed?

The application was filed on 12 Apr 2025.

Project details

StatusEnvironmental approval granted
Status since28 May 2025
Application filed12 Apr 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantPrateek Pramod Bhatnagar
Land area3.3 acres (1.3 ha)
Project cost₹85 lakh
Village / localityBiruwala Farm
Taluk / tehsilNajibabad
DistrictBijnor
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03773

In context

24 applications in Bijnor since January 2022 are in the same category (Mining): 15 approved, 9 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 3.3 acres, this one is smaller than 62% of them.

No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.

Where it is

Biruwala Farm, Najibabad, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Prateek Pramod Bhatnagar in Bijnor

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.