Quick answers
What is this project?
"R.B.M. (In mix form) Mining" Project at Gata No.- 413, 414, 221, 222, 223, 218, Village- Biruwala, Tehsil- Najibabad, District- Bijnor, U.P. (Applied Area : 2.10 ha.) Prop.- Shri Kafil Ahmad S/o Shri Shabbir Ahmad is an approved mining project in Biruwala Farm, Najibabad, Bijnor, Uttar Pradesh. The site covers 5.2 acres.
Who is building it?
The applicant is Kafil ahmad.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Jan 2025), as of 27 Nov 2026.
Where is it?
In Biruwala Farm, Najibabad, Bijnor, Uttar Pradesh.
How big is it?
It has a stated cost of ₹38 lakh and a site of 5.2 acres.
When was it filed?
The application was filed on 10 Oct 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Jan 2025 |
| Application filed | 10 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kafil ahmad |
| Land area | 5.2 acres (2.1 ha) |
| Project cost | ₹38 lakh |
| Village / locality | Biruwala Farm |
| Taluk / tehsil | Najibabad |
| District | Bijnor |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01807 |
In context
24 applications in Bijnor since January 2022 are in the same category (Mining): 15 approved, 9 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 5.2 acres, this one is larger than 63% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Biruwala Farm, Najibabad, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Proposed Project of Mining of RBM (Mixed form) on Riverbed of Malin River"… — environmental approval granted, 1.5 km away
- Mirpur Durg RBM Mining Project, Proponent Team Growth Private Limited, Prateek… — environmental approval granted, 4.1 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — lapsed, 7.9 km away
- Sundarwali Sand Mining Project, Located on river bed of Khoh River (1.960 ha) — environmental approval granted, 8.2 km away
- Diversion of Forest Land for Construction of Guide Bund at Sukhro River by NHAI — forest land use approved, 8.3 km away
- Proposed Protected Forest Land to be diverted for Entry/Exit approach to M/s… — more information requested, 10 km away
- Proposed Project of "Sand- Bajri-Boulders in Mixed State (RBM) Mine" located… — environmental approval granted, 10.7 km away
- Proposed Project of "Sand- Bajri-Boulders in Mixed State (RBM) Mine" located… — cleared for impact study, 10.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.