Quick answers
What is this project?
Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail Outlet is a proposed fuel station in Najarpur, Hamirpur, Uttar Pradesh. The site covers 0.5 acres.
Who is building it?
The applicant is Bharat Petroleum Corporation Limited (BPCL).
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Najarpur, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹55 lakh; a site of 0.5 acres and 650 m² of forest land.
When was it filed?
The application was filed on 17 Dec 2025.
Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail Outlet at Village: - Najarpur, Tehsil: -Hamirpur, District: - Hamirpur (Uttar Pradesh) |
|---|---|
| Status | More information requested |
| Status since | 10 Jan 2026 |
| Application filed | 17 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 1,900 m² |
| Forest land | 650 m² |
| Project cost | ₹55 lakh |
| Village / locality | Najarpur |
| Taluk / tehsil | Hamirpur |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06175 |
In context
13 applications in Hamirpur since January 2022 are in the same category (Fuel stations): 5 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 0.5 acres, this one is smaller than 100% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Najarpur, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Hindustan Petroleum Corporation Ltd. retail outlet On Kanpur-Kabrai… — in-principle approval, conditions pending, 2.2 km away
- "Development of Economic Corridors, Inter Corridors and Feeder Routes to… — under environmental review, 3.1 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — more information requested, 3.3 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 3.3 km away
- Proposed Agrochemicals & Intermediates, API Ingredients & Intermediates and… — environmental approval granted, 5.8 km away
- Proposed Agrochemicals & Intermediates, API Ingredients & Intermediates and… — cleared for impact study, 5.8 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — more information requested, 8.2 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 8.2 km away
More from Bharat Petroleum Corporation Limited (BPCL) in Hamirpur
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — in-principle approval, conditions pending
- Proposed protected forest land to be diverted for Entry/Exit approach to… — in-principle approval, conditions pending
4 Bharat Petroleum Corporation (BPCL) projects in Hamirpur
All 656 Bharat Petroleum Corporation (BPCL) projects across India