Quick answers
What is this project?
Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail Outlet is an approved fuel station in Lodipur Jalalpur, Maudaha, Hamirpur, Uttar Pradesh. The site covers 1.3 acres.
Who is building it?
The applicant is Bharat Petroleum Corporation Limited (BPCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 9 Aug 2025), as of 27 Nov 2026.
Where is it?
In Lodipur Jalalpur, Maudaha, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹65 lakh; a site of 1.3 acres and 2,230 m² of forest land.
When was it filed?
The application was filed on 5 Nov 2024.
Project details
| Official title | Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail Outlet at Village: - Lodhipur, Tehsil: -Maudaha, District: - Hamirpur. |
|---|---|
| Status | Forest land use approved |
| Status since | 9 Aug 2025 |
| Application filed | 5 Nov 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 1.3 acres (0.5 ha) |
| Forest land | 2,230 m² |
| Project cost | ₹65 lakh |
| Village / locality | Lodipur Jalalpur |
| Taluk / tehsil | Maudaha |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06458 |
In context
13 applications in Hamirpur since January 2022 are in the same category (Fuel stations): 5 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 1.3 acres, this one is larger than 92% of them.
Where it is
Lodipur Jalalpur, Maudaha, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-Diversion for Reliance 4g Project for Laying of Optical Fibre Cable (Ofc) — lapsed, 8.6 km away
- Re-Diversion for Reliance 4g Project for Laying of Optical Fibre Cable (Ofc) — lapsed, 9.5 km away
- "Morrum Mining Project" on the riverbed of River Betwa at Khand No.… — lapsed, 9.5 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — returned to applicant, 9.7 km away
- " Sand/Morrum Mine" from Riverbed of Betwa River, Village- Beri (Khand No.… — returned to applicant, 9.7 km away
- " Sand/Morrum Mine" from Riverbed of Betwa River, Village- Beri (Khand No.… — cleared for impact study, 9.7 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — lapsed, 9.7 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — cleared for impact study, 9.7 km away
More from Bharat Petroleum Corporation Limited (BPCL) in Hamirpur
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — more information requested
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — in-principle approval, conditions pending
- Proposed protected forest land to be diverted for Entry/Exit approach to… — in-principle approval, conditions pending
4 Bharat Petroleum Corporation (BPCL) projects in Hamirpur
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.