Quick answers
What is this project?
Diversion of 0.1530 Hectare of Protected Forest Land Under Social Forestry Division, Farrukhabad for Access Road to Retail Outlet of M/S Indian Oil Corporation Ltd is an approved fuel station in Kankapur, Amritpur, Farrukhabad, Uttar Pradesh. The site covers 0.7 acres.
Who is building it?
The applicant is Indian Oil Corporation Limited (IOCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 11 Aug 2026), as of 27 Nov 2026.
Where is it?
In Kankapur, Amritpur, Farrukhabad, Uttar Pradesh.
How big is it?
It has a stated cost of ₹75 lakh; a site of 0.7 acres and 1,530 m² of forest land.
When was it filed?
The application was filed on 12 Jan 2026.
Project details
| Official title | Diversion of 0.1530 Hectare of Protected Forest Land Under Social Forestry Division, Farrukhabad for Access Road to Retail Outlet of M/S Indian Oil Corporation Ltd, at Village- Kankapur, Khasra No.- 224, in Chainage- 43.934 (LHS) On Bewar- Pilibhit Road, (NH-730C) Tehsil- Amritpur & District- Farrukhabad, Uttarpradesh |
|---|---|
| Status | Forest land use approved |
| Status since | 11 Aug 2026 |
| Application filed | 12 Jan 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 2,800 m² |
| Forest land | 1,530 m² |
| Project cost | ₹75 lakh |
| Village / locality | Kankapur |
| Taluk / tehsil | Amritpur |
| District | Farrukhabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06744 |
In context
9 applications in Farrukhabad since January 2022 are in the same category (Fuel stations): 5 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kankapur, Amritpur, Farrukhabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed PF land for Entry and Exit of Nayara Energy Limited Retail Outlet on… — forest land use approved, 1.4 km away
- proposed "Ordinary Soil Excavation Project" at Gata No.- 554, 553, 354, 131,… — environmental approval granted, 4.8 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — in-principle approval, conditions pending, 7.3 km away
- New 2-Lane/4-Lane Major bridges at Km 3+500 on Kali River, Km 39+840 on Ganga… — more information requested, 8 km away
- Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy… — forest land use approved, 10.1 km away
- Ordinary Soil Excavation Project — more information requested, 11.3 km away
- proposed "Ordinary Soil Excavation Project" at Gata No.- 128Mi, 129 (Total… — environmental approval granted, 12.4 km away
- Proposed "Ordinary Soil Mining Project" at Gata No. 131 by Shri Virendra Kumar — under environmental review, 12.6 km away
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.