Quick answers
What is this project?
Proposed PF land for Entry and Exit of Nayara Energy Limited Retail Outlet on Bewar-Allahganj road NH 730C km 43 ch.-42.546 to 42.588 LHS is an approved fuel station in Patti Badanpur, Amritpur, Farrukhabad, Uttar Pradesh. The site covers 1.2 acres.
Who is building it?
The applicant is Krishna Shanker Pandey.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 15 Apr 2026), as of 27 Nov 2026.
Where is it?
In Patti Badanpur, Amritpur, Farrukhabad, Uttar Pradesh.
How big is it?
It has a stated cost of ₹50 lakh; a site of 1.2 acres and 1,750 m² of forest land.
When was it filed?
The application was filed on 18 Jun 2025.
Project details
| Official title | Proposed PF land for Entry and Exit of Nayara Energy Limited Retail Outlet on Bewar-Allahganj road NH 730C km 43 ch.-42.546 to 42.588 LHS at Khasra no-50 Village patti badanpur Tahsil Amritpur District Farrukhabad |
|---|---|
| Status | Forest land use approved |
| Status since | 15 Apr 2026 |
| Application filed | 18 Jun 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Krishna Shanker Pandey |
| Land area | 1.2 acres (0.5 ha) |
| Forest land | 1,750 m² |
| Project cost | ₹50 lakh |
| Village / locality | Patti Badanpur |
| Taluk / tehsil | Amritpur |
| District | Farrukhabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06948 |
In context
9 applications in Farrukhabad since January 2022 are in the same category (Fuel stations): 5 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Patti Badanpur, Amritpur, Farrukhabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.1530 Hectare of Protected Forest Land Under Social Forestry… — forest land use approved, 1.4 km away
- proposed "Ordinary Soil Excavation Project" at Gata No.- 554, 553, 354, 131,… — environmental approval granted, 5.8 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — in-principle approval, conditions pending, 5.9 km away
- New 2-Lane/4-Lane Major bridges at Km 3+500 on Kali River, Km 39+840 on Ganga… — more information requested, 6.7 km away
- Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy… — forest land use approved, 8.7 km away
- Ordinary Soil Excavation Project — more information requested, 10.1 km away
- proposed "Ordinary Soil Excavation Project" at Gata No.- 128Mi, 129 (Total… — environmental approval granted, 11.1 km away
- Proposed "Ordinary Soil Mining Project" at Gata No. 131 by Shri Virendra Kumar — under environmental review, 11.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.