Quick answers
What is this project?
Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet is an approved fuel station in Malaon, Hasanganj, Unnao, Uttar Pradesh. The site covers 0.9 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 5 May 2025), as of 27 Nov 2026.
Where is it?
In Malaon, Hasanganj, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹65 lakh; a site of 0.9 acres and 1,060 m² of forest land.
When was it filed?
The application was filed on 20 May 2024.
Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet at Village: - Malav, Tehsil: -Hasanganj, District:- Unnao. |
|---|---|
| Status | Forest land use approved |
| Status since | 5 May 2025 |
| Application filed | 20 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 3,600 m² |
| Forest land | 1,060 m² |
| Project cost | ₹65 lakh |
| Village / locality | Malaon |
| Taluk / tehsil | Hasanganj |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06310 |
In context
13 applications in Unnao since January 2022 are in the same category (Fuel stations): 9 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.9 acres, this one is larger than 54% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Malaon, Hasanganj, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Earth Mining Project" at Gata No. – 228 Mi., 318 Mi., 319 Mi. and… — environmental approval granted, 1.8 km away
- Improvement and Rectification work of 05 nos. of MoRTH Identified Black Spot… — in-principle approval, conditions pending, 2 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to to Property of… — lapsed, 2.1 km away
- "Ordinary Soil Excavation Mining" Project at Gata No.- 550मि0, 580मि0, 580मि0,… — environmental approval granted, 2.8 km away
- Ordinary Soil Mine — environmental approval granted, 4 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 4.6 km away
- Environmental Clearance for the Proposed Aluminium Can Manufacturing Unit at… — under environmental review, 5.4 km away
- Proposed Integrated Manufacturing and Logistic Cluster (IMLC) Unnao — environmental approval granted, 5.7 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Unnao
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — forest land use approved
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved
3 Hindustan Petroleum Corporation (HPCL) projects in Unnao
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.