Quick answers
What is this project?
"Ordinary Earth Mining Project" at Gata No. – 228 Mi., 318 Mi., 319 Mi. and 228 Anga, Village- Jagdishpur, Pargana - Jhalotar Ajgain, Tehsil- Hasanganj, District- Unnao of State- Uttar Pradesh, Area- 0.631 ha By M/s Vinayak Associates, Vaibhav Gupta is an approved mining project in Jagdishpur, Hasanganj, Unnao, Uttar Pradesh. The site covers 1.6 acres.
Who is building it?
The applicant is Vaibhav gupta.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 24 May 2025), as of 27 Nov 2026.
Where is it?
In Jagdishpur, Hasanganj, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹8 lakh and a site of 1.6 acres.
When was it filed?
The application was filed on 25 Feb 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 May 2025 |
| Application filed | 25 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vaibhav gupta |
| Land area | 1.6 acres (0.6 ha) |
| Project cost | ₹8 lakh |
| Village / locality | Jagdishpur |
| Taluk / tehsil | Hasanganj |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03654 |
In context
72 applications in Unnao since January 2022 are in the same category (Mining): 49 approved, 21 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.6 acres, this one is smaller than 80% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Jagdishpur, Hasanganj, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Soil Excavation Mining" Project at Gata No.- 550मि0, 580मि0, 580मि0,… — environmental approval granted, 1.3 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to to Property of… — lapsed, 1.4 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 1.8 km away
- Improvement and Rectification work of 05 nos. of MoRTH Identified Black Spot… — in-principle approval, conditions pending, 2.4 km away
- Ordinary Soil Mine — environmental approval granted, 4.5 km away
- Environmental Clearance for the Proposed Aluminium Can Manufacturing Unit at… — under environmental review, 5 km away
- Proposed industrial shed for Manufacturing of Aluminium Beverage Cans by M/s.… — environmental approval granted, 5 km away
- Proposed Integrated Manufacturing and Logistic Cluster (IMLC) Unnao — environmental approval granted, 5.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.