Quick answers
What is this project?
Improvement and Rectification work of 05 nos. of MoRTH Identified Black Spot Location through long term measures on Lucknow Kanpur Section of Old NH-25 (New NH-27) (Km 27 700 to Km 75 500) in the State of UP- Diversion of 3.025 Ha. Protected Forest Land under Social Forestry Division, Unnao for construction of Underpass & Junction Improvement for 05 Nos. of separate Blackspot Locations is a proposed road project in Chamrauli, Hasanganj, Unnao, Uttar Pradesh. The site covers 43 acres.
Who is building it?
The applicant is National Highway Authority of India.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Chamrauli, Hasanganj, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹136.8 crore; a site of 43 acres and 7.5 acres (3 ha) of forest land.
When was it filed?
The application was filed on 1 Dec 2025.
Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 30 Sept 2026 |
| Application filed | 1 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | National Highway Authority of India |
| Land area | 43 acres (17.4 ha) |
| Forest land | 7.5 acres (3 ha) |
| Project cost | ₹136.8 crore |
| Village / locality | Chamrauli |
| Taluk / tehsil | Hasanganj |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05651 |
In context
7 applications in Unnao since January 2022 are in the same category (Roads & highways): 2 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chamrauli, Hasanganj, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Entry/Exit Approach to to Property of… — lapsed, 1.3 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 2 km away
- "Ordinary Soil Excavation Mining" Project at Gata No.- 550मि0, 580मि0, 580मि0,… — environmental approval granted, 2.3 km away
- "Ordinary Earth Mining Project" at Gata No. – 228 Mi., 318 Mi., 319 Mi. and… — environmental approval granted, 2.4 km away
- Environmental Clearance for the Proposed Aluminium Can Manufacturing Unit at… — under environmental review, 3.5 km away
- Proposed Integrated Manufacturing and Logistic Cluster (IMLC) Unnao — environmental approval granted, 3.8 km away
- Proposed Integrated Manufacturing and Logistic Cluster (IMLC) Unnao — cleared for impact study, 3.8 km away
- Proposed Integrated Manufacturing and Logistic Cluster (IMLC) Unnao — returned to applicant, 3.8 km away
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.