Project details
| Official title | Proposed Expansion of Coal Washery from 0.123744 to 0.4 MTPA, DRI from 0.120 to 0.160 MTPA, Induction Furnace from 0.2994 to 1.0 MTPA, SAF 0.078536 to 0.19 MTPA, Rolling Mill from 0.231996 to 1.0 MTPA, CPP from 85 to 120 MW with existing Coke oven 0.35 MTPA, Producer Gas Plant 9000 Nm3/hr, New (Refining facilities including EAF, BOF, AOD, CLU Converter, LRF, VD) along with Briquette Plant and Metal recovery Plant of 0.14 MTPA each while dropping MBF by M/s Jai Balaji Industries Limited (Unit IV) |
|---|---|
| Status | Under environmental review |
| Status since | 5 Nov 2026 |
| Application filed | 13 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Jai Balaji Industries Limited |
| Land area | 140 acres (56.7 ha) |
| Project cost | ₹1,718.5 crore |
| Village / locality | Banskopa |
| Taluk / tehsil | Kanksa |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01747 |
In context
169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 140 acres, this one is larger than 78% of them.
33 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Banskopa, Kanksa, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion cum modification of existing Steel Plant by modification of existing… — under environmental review, 1.3 km away
- Expansion cum modification of existing Steel Plant by modification of existing… — cleared for impact study, 1.3 km away
- Proposed Capacity Enhancement (40% Maximum in Two Stages of Maximum 20% Each)… — environmental approval granted, 1.3 km away
- Proposed Capacity Enhancement (40% Maximum in Two Stages of Maximum 20% Each)… — withdrawn, 1.3 km away
- Proposed Expansion of Existing Steel Plant by enhancement of Production… — returned to applicant, 1.3 km away
- Proposed expansion of existing Steel Plant for replacement of existing 2x7 T… — environmental approval granted, 2 km away
- Proposed expansion of existing Steel Plant for replacement of existing 2x7 T… — cleared for impact study, 2 km away
- Expansion of Structural Mill from 1,19,988 TPA to 1,50,000 TPA and installing… — under environmental review, 2.1 km away
4 Jai Balaji Industries projects in Paschim Bardhaman
All 6 Jai Balaji Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.