Quick answers
What is Integrated Steel Plant?
Integrated Steel Plant is a withdrawn industrial project in Kurud, Arang, Raipur, Chhattisgarh. The site covers 40.7 acres.
Who is building it?
The applicant is Jsw Ispat Special Products Limited.
Has it been approved?
No. The application was withdrawn on 24 Nov 2023, so it is no longer under consideration.
Where is it?
In Kurud, Arang, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹35 crore and a site of 40.7 acres.
When was it filed?
The application was filed on 25 Aug 2023.
Project details
| Status | Withdrawn |
|---|---|
| Status since | 24 Nov 2023 |
| Application filed | 25 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Jsw Ispat Special Products Limited |
| Land area | 40.7 acres (16.5 ha) |
| Project cost | ₹35 crore |
| Village / locality | Kurud |
| Taluk / tehsil | Arang |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00141 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 40.7 acres, this one is larger than 59% of them.
136 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kurud, Arang, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rolling Mill (1,50,000 TPA) in the existing Integrated Steel Plant at Monnet… — environmental approval granted, 0 m away
- Establishment of Rolling Mill (1,50,000 TPA) — withdrawn, 0 m away
- Proposed Increase in Production Capacity of Existing Rolling Mill Capacity… — initial checks, 100 m away
- Proposed "increase in Production Capacity of Existing Ferro Alloy From 44,000… — initial checks, 450 m away
- Proposed Up Gradation of existing Induction Furnaces of 2 x 8T to 2 x 10T &… — initial checks, 650 m away
- Expansion of Integrated Steel Complex — environmental approval granted, 650 m away
- Expansion of Integrated Steel Complex — lapsed, 650 m away
- Expansion of Integrated Steel Complex — environmental approval granted, 650 m away
More from Jsw Ispat Special Products Limited in Raipur
- Expansion of Integrated Steel Complex — lapsed
- Establishment of Rolling Mill (1,50,000 TPA) — withdrawn
- Expansion of Integrated Steel Complex — environmental approval granted
4 Jsw Ispat Special Products projects in Raipur
All 5 Jsw Ispat Special Products projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.