Proposed Up Gradation of existing Induction Furnaces of 2 x 8T to 2 x 10T & Installation of New 1 x 20 T Induction Furnace Without Change in Production capacity and without increase in the Pollution Load in the existing plant premises as per Gazette Notification dated 23rd November 2016 & 16th January, 2020 & 2nd March 2021 issued by Ministry of Environment, Forest & Climate Change

Proposed Up Gradation of existing Induction Furnaces of 2 x 8T to 2 x 10T & Installation of New 1 x 20 T Induction Furnace Without Change in Production capacity and without increase in the Pollution Load in the existing plant premises as per Gazette Notification dated 23rd November 2016 & 16th January, 2020 & 2nd March 2021 issued by Ministry of Environment, Forest & Climate Change is a proposed industrial project in Kurud, Arang, Raipur, Chhattisgarh. The site covers 130 acres. Its stated project cost is ₹27.1 crore. As of 27 Nov 2026, its status is “Initial checks” (since 7 Apr 2026).

See it on the live map All projects in Raipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Up Gradation of existing Induction Furnaces of 2 x 8T to 2 x 10T & Installation of New 1 x 20 T Induction Furnace Without Change in Production capacity and without increase in the Pollution Load in the existing plant premises as per Gazette Notification dated 23rd November 2016 & 16th January, 2020 & 2nd March 2021 issued by Ministry of Environment, Forest & Climate Change is a proposed industrial project in Kurud, Arang, Raipur, Chhattisgarh. The site covers 130 acres.

Who is building it?

The applicant is Mivaan Steels Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Kurud, Arang, Raipur, Chhattisgarh.

How big is it?

It has a stated cost of ₹27.1 crore and a site of 130 acres.

When was it filed?

The application was filed on 7 Apr 2026.

Project details

StatusInitial checks
Status since7 Apr 2026
Application filed7 Apr 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantMivaan Steels Limited
Land area130 acres (52.6 ha)
Project cost₹27.1 crore
Village / localityKurud
Taluk / tehsilArang
DistrictRaipur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-03481

In context

219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 130 acres, this one is larger than 85% of them.

108 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kurud, Arang, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Mivaan Steels Limited in Raipur

5 Mivaan Steels projects in Raipur
All 8 Mivaan Steels projects across India

About this information