What is Expansion of Integrated Steel Complex?
Expansion of Integrated Steel Complex is an approved industrial project in Kurud, Arang, Raipur, Chhattisgarh. The site covers 130 acres.
Who is building it?
The applicant is Mivaan Steels Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 1 Apr 2026), as of 27 Nov 2026.
Where is it?
In Kurud, Arang, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹623.7 crore and a site of 130 acres.
When was it filed?
The application was filed on 2 Jul 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 1 Apr 2026 |
| Application filed | 2 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Mivaan Steels Limited |
| Land area | 130 acres (52.6 ha) |
| Project cost | ₹623.7 crore |
| Village / locality | Kurud |
| Taluk / tehsil | Arang |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02391 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 130 acres, this one is larger than 85% of them.
106 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kurud, Arang, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Up Gradation of existing Induction Furnaces of 2 x 8T to 2 x 10T &… — initial checks, 0 m away
- Expansion of Integrated Steel Complex — lapsed, 0 m away
- Expansion of Integrated Steel Complex — environmental approval granted, 0 m away
- Proposed "increase in Production Capacity of Existing Ferro Alloy From 44,000… — initial checks, 250 m away
- Proposed Increase in Production Capacity of Existing Rolling Mill Capacity… — initial checks, 600 m away
- Rolling Mill (1,50,000 TPA) in the existing Integrated Steel Plant at Monnet… — environmental approval granted, 650 m away
- Establishment of Rolling Mill (1,50,000 TPA) — withdrawn, 650 m away
- Integrated Steel Plant — withdrawn, 650 m away
More from Mivaan Steels Limited in Raipur
- Proposed Up Gradation of existing Induction Furnaces of 2 x 8T to 2 x 10T &… — initial checks
- Proposed "increase in Production Capacity of Existing Ferro Alloy From 44,000… — initial checks
- Rolling Mill (1,50,000 TPA) in the existing Integrated Steel Plant at Monnet… — environmental approval granted
- Proposed Increase in Production Capacity of Existing Rolling Mill Capacity… — initial checks
5 Mivaan Steels projects in Raipur
All 8 Mivaan Steels projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.