Project details
| Official title | Proposal for diversion of 20.2286 ha. of RESERVED forest land for work of GETCO 400kV D/C Vataman Dholera-2 line Package-2 (from AP-60 to AP-68/2), Vill : KADIPUR ,Tal: Dholera , Dist; Ahmedabad , State: Gujarat. |
|---|---|
| Status | More information requested |
| Status since | 28 Sept 2026 |
| Application filed | 7 Jan 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Getco |
| Land area | 50 acres (20.2 ha) |
| Forest land | 50 acres (20.2 ha) |
| Project cost | ₹164.9 crore |
| Village / locality | Kadipur |
| Taluk / tehsil | Dholera |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12321 |
In context
19 applications in Ahmadabad since January 2022 are in the same category (Power): 10 approved, 9 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 50 acres, this one is larger than 76% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kadipur, Dholera, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Blueparrot Data Centre: 813 MW Data Centre Building Project in Dholera, Gujarat (7.8 km away).
Other projects nearby
- 8" dia. Steel Gas pipeline from End Point of Dhandhuka-Dholera Pipeline Near… — forest land use approved, 4.5 km away
- Shantiban Skylar — initial checks, 5.9 km away
- Environment Clearance for proposed Factory Building construction project for… — environmental approval granted, 6 km away
- Expansion of Semiconductor Wafer Fabrication Project — under environmental review, 6.1 km away
- Environment Clearance for proposed Factory Building construction project for… — initial checks, 6.2 km away
- Approach roads for Smart Homes Infrastructure Pvt Limited Dholera, district… — forest land use approved, 6.3 km away
- Semiconductor Wafer Fabrication — environmental approval granted, 6.3 km away
- Semiconductor Wafer Fabrication — environmental approval granted, 6.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.