Forest land use approvedPipelines · Valsad, Gujarat

(1) 160/125/90 mm PE Gas Pipeline For Sarigam HDFC Bank to Sarigam Teen Rasta, (2) 160/125/90 mm Dia PE Gas Pipeline Connectivity for Tumb River Sanjan to Timbhi Village. (3) 160/125/90 mm Dia PE Gas Pipeline Connectivity for Dhodipada to Maroli, , Ta: Umargam, Dist.-Valsad.

(1) 160/125/90 mm PE Gas Pipeline For Sarigam HDFC Bank to Sarigam Teen Rasta, (2) 160/125/90 mm Dia PE Gas Pipeline Connectivity for Tumb River Sanjan to Timbhi Village. (3) 160/125/90 mm Dia PE Gas Pipeline Connectivity for Dhodipada to Maroli, , Ta: Umargam, Dist.-Valsad is an approved pipeline project in Sarigam, Umbergaon, Valsad, Gujarat. The site covers 0.3 acres. Its stated project cost is ₹1.6 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 17 Jul 2026).

See it on the live map All projects in Valsad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

(1) 160/125/90 mm PE Gas Pipeline For Sarigam HDFC Bank to Sarigam Teen Rasta, (2) 160/125/90 mm Dia PE Gas Pipeline Connectivity for Tumb River Sanjan to Timbhi Village. (3) 160/125/90 mm Dia PE Gas Pipeline Connectivity for Dhodipada to Maroli, , Ta: Umargam, Dist.-Valsad is an approved pipeline project in Sarigam, Umbergaon, Valsad, Gujarat. The site covers 0.3 acres.

Who is building it?

The applicant is Gujarat Gas Limited.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 17 Jul 2026), as of 27 Nov 2026.

Where is it?

In Sarigam, Umbergaon, Valsad, Gujarat.

How big is it?

It has a stated cost of ₹1.6 crore; a site of 0.3 acres and 1,140 m² of forest land.

When was it filed?

The application was filed on 12 Dec 2025.

Project details

StatusForest land use approved
Status since17 Jul 2026
Application filed12 Dec 2025
Approval soughtForest land use
Application typeNew project
SectorPipelines
ApplicantGujarat Gas Limited
Land area1,100 m²
Forest land1,140 m²
Project cost₹1.6 crore
Village / localitySarigam
Taluk / tehsilUmbergaon
DistrictValsad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-12787

In context

35 applications in Valsad since January 2022 are in the same category (Pipelines): 22 approved, 4 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.3 acres, this one is smaller than 57% of them.

15 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sarigam, Umbergaon, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Gujarat Gas Limited in Valsad

29 Gujarat Gas projects in Valsad
All 289 Gujarat Gas projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.