Submission of 1.04916 Hac. Forest Land Proposal for Diversion for Social Forest Land Proposal for Forest Clearance for Laying of 66KV 1c, 630 Sq.Mm 2x (3+1) U/G Cable Laying Work From Loc.34 of 66KV Sarigam Saronda Line No.1 to Proposed 66KV Kalgam Sub-Station [total Length: 7.8 Km] is a lapsed project in Kalgam, Umbergaon, Valsad, Gujarat. The site covers 2.6 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corp LTD.
Has it been approved?
No. The application was lapsed on 3 Nov 2026, so it is no longer under consideration.
Where is it?
In Kalgam, Umbergaon, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹35.8 crore; a site of 2.6 acres and 2.6 acres (1 ha) of forest land.
When was it filed?
The application was filed on 9 Apr 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 3 Nov 2026 |
| Application filed | 9 Apr 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Gujarat Energy Transmission Corp LTD |
| Land area | 2.6 acres (1.1 ha) |
| Forest land | 2.6 acres (1 ha) |
| Project cost | ₹35.8 crore |
| Village / locality | Kalgam |
| Taluk / tehsil | Umbergaon |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12882 |
In context
33 applications in Valsad since January 2022 are in the same category (Other): 3 approved, 23 filed or under review, and 7 withdrawn, lapsed or rejected. At 2.6 acres, this one is smaller than 55% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kalgam, Umbergaon, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Man-Made Fiber Manufacturing Industrial Unit by M/s Preeyarika Innovations… — cleared for impact study, 1.4 km away
- (1) 160/125/90 mm PE Gas Pipeline For Sarigam HDFC Bank to Sarigam Teen Rasta,… — forest land use approved, 1.5 km away
- PROVIDING COSTAL PROTECTION WORK — recommended by coastal authority, 2.5 km away
- Maroli Blacktrap Mining Project, Survey No. 111/2 Paiky 1, proposed by Shiv… — environmental approval granted, 2.5 km away
- PROVIDING COASTAL PROTECTION WORK — recommended by coastal authority, 3.1 km away
- 160/125/90 mm PE Gas Pipeline Connectivity from Sarigam to Sarai village Ta:… — forest land use approved, 3.3 km away
- Maroli Blacktrap Mine (Dipakbhai Gajanand Naik) — under environmental review, 3.6 km away
- DGVCL transmission lint to Samaro Global Industries Pvt. Ltd. — lapsed, 4.7 km away
More from Gujarat Energy Transmission Corp LTD in Valsad
- Submission Proposal for Diversion of Forest Land of 0.0217 Hectare for forest… — lapsed
- Submission of 0.3521 Forest Land (Protected) Proposal for Diversion for Social… — under forest review
- Diversion of 19.3778 Ha Reserved Forest Land for construction of 66KV… — under forest review
- Diversion of 3.6709 Ha. Of Reserved Forest Land for construction of 66KV… — lapsed
- Diversion of 8.4109 Ha. Of Reserved Forest Land for construction of 66 KV… — more information requested
- Submission of 0.8848 Hac. Forest land proposal for Diversion for Social Forest… — forest land use approved
12 Gujarat Energy Transmission Corp projects in Valsad
All 231 Gujarat Energy Transmission Corp projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.