Quick answers
What is this project?
160/125/90 mm PE Gas Pipeline Connectivity from Sarigam to Sarai village Ta: Umargam Dist.-Valsad is an approved pipeline project in Mamakwada, Umbergaon, Valsad, Gujarat. The site covers 0.4 acres.
Who is building it?
The applicant is Gujarat Gas Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 17 Jul 2026), as of 27 Nov 2026.
Where is it?
In Mamakwada, Umbergaon, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹2.1 crore; a site of 0.4 acres and 1,500 m² of forest land.
When was it filed?
The application was filed on 8 Jun 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 17 Jul 2026 |
| Application filed | 8 Jun 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Gujarat Gas Limited |
| Land area | 1,500 m² |
| Forest land | 1,500 m² |
| Project cost | ₹2.1 crore |
| Village / locality | Mamakwada |
| Taluk / tehsil | Umbergaon |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13777 |
In context
35 applications in Valsad since January 2022 are in the same category (Pipelines): 22 approved, 4 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.4 acres, this one is larger than 57% of them.
46 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mamakwada, Umbergaon, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- (1) 160/125/90 mm PE Gas Pipeline For Sarigam HDFC Bank to Sarigam Teen Rasta,… — forest land use approved, 1.9 km away
- Maroli Blacktrap Mining Project, Survey No. 111/2 Paiky 1, proposed by Shiv… — environmental approval granted, 2.1 km away
- Industrial project by M/s. A. B. Rolling Mills Pvt. Ltd. - Application for ToR… — cleared for impact study, 2.6 km away
- Maroli Blacktrap Mine (Dipakbhai Gajanand Naik) — under environmental review, 2.9 km away
- Industrial project by M/s. Veer Metal Industries Pvt. Ltd. - Application for… — cleared for impact study, 2.9 km away
- Industrial project by M/S. Rathod Industries - Application for Tor for… — cleared for impact study, 3.1 km away
- Submission of 1.04916 Hac. Forest Land Proposal for Diversion for Social… — lapsed, 3.3 km away
- Man-Made Fiber Manufacturing Industrial Unit by M/s Preeyarika Innovations… — cleared for impact study, 3.5 km away
More from Gujarat Gas Limited in Valsad
- Diversion of 0.03268 HA. of PF land for Reliable Packaging & Ayurvedic College… — more information requested
- Diversion of 0.00048 Ha. of PF Land for laying of 90 mm PE Pipeline Network to… — more information requested
- Gas Distribution Network in Valsad Taluka & Surrounding Areas, Diversion of… — lapsed
- Diversion of 0.1544 Ha. protected forest land for laying 125/90 mm dia. MDPE… — lapsed
- Diversion of 0.0508 Hectare Protected Forest Land for Laying 125/90 Mm… — lapsed
- Permission for laying 4" dia. steel & 90 mm dia. PE pipeline along NH-48 &… — forest land use approved
29 Gujarat Gas projects in Valsad
All 289 Gujarat Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.