Environmental approval grantedIndustry · Bagalkote, Karnataka

Expansion of Distillery for Ethanol Production Under Ebp Program From 700 Kld to 1200 Kld Using C Heavy Molasses/ B - Heavy Molasses / Cane Juice Syrup/ Grains and Captive Power Plant From 16 MW to 24 MW by M/S. Trualt Bioenergy LTD., - Unit 1.

Expansion of Distillery for Ethanol Production Under Ebp Program From 700 Kld to 1200 Kld Using C Heavy Molasses/ B - Heavy Molasses / Cane Juice Syrup/ Grains and Captive Power Plant From 16 MW to 24 MW by M/S. Trualt Bioenergy LTD., - Unit 1 is an approved industrial project in Malapur, Mudhol, Bagalkote, Karnataka. The site covers 45.9 acres. Its stated project cost is ₹338 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 4 Nov 2024).

See it on the live map All projects in Bagalkote

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Distillery for Ethanol Production Under Ebp Program From 700 Kld to 1200 Kld Using C Heavy Molasses/ B - Heavy Molasses / Cane Juice Syrup/ Grains and Captive Power Plant From 16 MW to 24 MW by M/S. Trualt Bioenergy LTD., - Unit 1 is an approved industrial project in Malapur, Mudhol, Bagalkote, Karnataka. The site covers 45.9 acres.

Who is building it?

The applicant is Trualt Bioenergy Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 4 Nov 2024), as of 27 Nov 2026.

Where is it?

In Malapur, Mudhol, Bagalkote, Karnataka.

How big is it?

It has a stated cost of ₹338 crore and a site of 45.9 acres.

When was it filed?

The application was filed on 22 Apr 2024.

Project details

StatusEnvironmental approval granted
Status since4 Nov 2024
Application filed22 Apr 2024
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantTrualt Bioenergy Limited
Land area45.9 acres (18.6 ha)
Project cost₹338 crore
Village / localityMalapur
Taluk / tehsilMudhol
DistrictBagalkote
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-01940

In context

61 applications in Bagalkote since January 2022 are in the same category (Industry): 39 approved, 11 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 45.9 acres, this one is smaller than 69% of them.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Malapur, Mudhol, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Trualt Bioenergy Limited in Bagalkote

All 10 Trualt Bioenergy projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.