What is Developing? Open the mapMap

Returned to applicantIndustry · Bagalkote, Karnataka

Expansion of Distillery from 120 KLPD to 700 KLPD for manufacturing of RS/ ENA/ Industrial Alcohol / Sustainable Aviation Fuel (SAF) using multi feedstock (C/B Heavy Molasses/Sugarcane Syrup/Grain)

Expansion of Distillery from 120 KLPD to 700 KLPD for manufacturing of RS/ ENA/ Industrial Alcohol / Sustainable Aviation Fuel (SAF) using multi feedstock (C/B Heavy Molasses/Sugarcane Syrup/Grain) is a proposed industrial project in Malapur, Mudhol, Bagalkote, Karnataka. The site covers 57.2 acres. Its stated project cost is ₹687 crore. As of 27 Nov 2026, its status is “Returned to applicant” (since 27 Jul 2026).

See it on the live map All projects in Bagalkote

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Distillery from 120 KLPD to 700 KLPD for manufacturing of RS/ ENA/ Industrial Alcohol / Sustainable Aviation Fuel (SAF) using multi feedstock (C/B Heavy Molasses/Sugarcane Syrup/Grain) is a proposed industrial project in Malapur, Mudhol, Bagalkote, Karnataka. The site covers 57.2 acres.

Who is building it?

The applicant is Trualt Bioenergy Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.

Where is it?

In Malapur, Mudhol, Bagalkote, Karnataka.

How big is it?

It has a stated cost of ₹687 crore and a site of 57.2 acres.

When was it filed?

The application was filed on 16 Jul 2026.

Project details

Official titleExpansion of Distillery from 120 KLPD to 700 KLPD for manufacturing of RS/ ENA/ Industrial Alcohol / Sustainable Aviation Fuel (SAF) using multi feedstock (C/B Heavy Molasses/Sugarcane Syrup/Grain) along with Captive Power Plant from 24 MW to 25 MW in the existing premises by TRUALT BIOENERGY LTD.; Unit-1 located at Village- Malapur & Mudhol, Tal.: Mudhol, Dist.: Bagalkot, Karnataka State.
StatusReturned to applicant
Status since27 Jul 2026
Application filed16 Jul 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantTrualt Bioenergy Limited
Land area57.2 acres (23.1 ha)
Project cost₹687 crore
Village / localityMalapur
Taluk / tehsilMudhol
DistrictBagalkote
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-04621

In context

61 applications in Bagalkote since January 2022 are in the same category (Industry): 39 approved, 11 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 57.2 acres, this one is smaller than 61% of them.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Malapur, Mudhol, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Trualt Bioenergy Limited in Bagalkote

All 10 Trualt Bioenergy projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.