Proposed Steel Plant (Green Field) with 8 × 650 TPD DRI Kilns-Sponge Iron (17,16,000 TPA), 1 × 65T Electric Arc Furnace (5,40,000 TPA)

Proposed Steel Plant (Green Field) with 8 × 650 TPD DRI Kilns-Sponge Iron (17,16,000 TPA), 1 × 65T Electric Arc Furnace (5,40,000 TPA) is a proposed industrial project in Mudholi Chak No.2, Chamorshi, Gadchiroli, Maharashtra. The site covers 247.7 acres. Its stated project cost is ₹5,489 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 16 Feb 2026).

See it on the live map All projects in Gadchiroli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Steel Plant (Green Field) with 8 × 650 TPD DRI Kilns-Sponge Iron (17,16,000 TPA), 1 × 65T Electric Arc Furnace (5,40,000 TPA) is a proposed industrial project in Mudholi Chak No.2, Chamorshi, Gadchiroli, Maharashtra. The site covers 247.7 acres.

Who is building it?

The applicant is Finecrafts Steel and Power Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 16 Feb 2026), as of 27 Nov 2026.

Where is it?

In Mudholi Chak No.2, Chamorshi, Gadchiroli, Maharashtra.

How big is it?

It has a stated cost of ₹5,489 crore and a site of 247.7 acres.

When was it filed?

The application was filed on 16 Feb 2026.

Project details

Official titleEstablishment of Proposed Steel Plant (Green Field) with 8 × 650 TPD DRI Kilns-Sponge Iron (17,16,000 TPA), 1 × 65T Electric Arc Furnace (5,40,000 TPA) along with 1 × 65T LRF, 1 × 4-Strand Billet Caster (5,24,000 TPA), Rolling Mill (Bar & Rod Mill 5,00,000 TPA) And with 6 × 30T Induction Furnaces, 2 × 30T LRFs, 2 × 3-Strand Billet Casters, and Rolling Mill (Light Medium Structural Mill 5, 00,000 TPA), WHRB based Power Plant 4x35MW and AFBC based Power Plant 2x 35 MW
StatusCleared for impact study
Status since16 Feb 2026
Application filed16 Feb 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantFinecrafts Steel and Power Private Limited
Land area247.7 acres (100.2 ha)
Project cost₹5,489 crore
Village / localityMudholi Chak No.2
Taluk / tehsilChamorshi
DistrictGadchiroli
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-11432

In context

30 applications in Gadchiroli since January 2022 are in the same category (Industry): 15 approved, 9 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 247.7 acres, this one is smaller than 63% of them.

12 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mudholi Chak No.2, Chamorshi, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.