Cleared for impact studyIndustry · Gadchiroli, Maharashtra

Proposed Greenfield 3.0 MTPA Integrated Steel Plant (1x1.5 MTPA Coke Oven Plant, 1x1.67 MTPA Sinter Plant, 3.14 MTPA BF, Lime & Dolo Plant (2x450 TPD & 1x250 TPD), Oxygen Plant: 1x600 TPD VPSA and 1x600 TPD Cryogenic, 2x180 T BOF, 2x180 T LRFs, 1x180 T RH Degasser, Hot Rolling: 30,70,184 TPA for producing 19,69,999 TPA Plate Rolling Mill & 9,14,642 TPA Rebar cum Wire-Rod mill) & Captive Power Generation of 230MW by Lloyds Metals & Energy Ltd.

Proposed Greenfield 3.0 MTPA Integrated Steel Plant (1x1.5 MTPA Coke Oven Plant, 1x1.67 MTPA Sinter Plant, 3.14 MTPA BF, Lime & Dolo Plant (2x450 TPD & 1x250 TPD), Oxygen Plant: 1x600 TPD VPSA and 1x600 TPD Cryogenic, 2x180 T BOF, 2x180 T LRFs, 1x180 T RH Degasser, Hot Rolling: 30,70,184 TPA for producing 19,69,999 TPA Plate Rolling Mill & 9,14,642 TPA Rebar cum Wire-Rod mill) & Captive Power Generation of 230MW by Lloyds Metals & Energy Ltd is a proposed industrial project in Mudholi Chak No.2, Chamorshi, Gadchiroli, Maharashtra. The site covers 1,076.5 acres. Its stated project cost is ₹16,580 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 5 Oct 2024).

See it on the live map All projects in Gadchiroli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Greenfield 3.0 MTPA Integrated Steel Plant (1x1.5 MTPA Coke Oven Plant, 1x1.67 MTPA Sinter Plant, 3.14 MTPA BF, Lime & Dolo Plant (2x450 TPD & 1x250 TPD), Oxygen Plant: 1x600 TPD VPSA and 1x600 TPD Cryogenic, 2x180 T BOF, 2x180 T LRFs, 1x180 T RH Degasser, Hot Rolling: 30,70,184 TPA for producing 19,69,999 TPA Plate Rolling Mill & 9,14,642 TPA Rebar cum Wire-Rod mill) & Captive Power Generation of 230MW by Lloyds Metals & Energy Ltd is a proposed industrial project in Mudholi Chak No.2, Chamorshi, Gadchiroli, Maharashtra. The site covers 1,076.5 acres.

Who is building it?

The applicant is M/S. Lloyds Metals and Energy Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 5 Oct 2024), as of 27 Nov 2026.

Where is it?

In Mudholi Chak No.2, Chamorshi, Gadchiroli, Maharashtra.

How big is it?

It has a stated cost of ₹16,580 crore and a site of 1,076.5 acres.

When was it filed?

The application was filed on 10 Aug 2024.

Project details

StatusCleared for impact study
Status since5 Oct 2024
Application filed10 Aug 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantM/S. Lloyds Metals and Energy Limited
Land area1,076.5 acres (435.7 ha)
Project cost₹16,580 crore
Village / localityMudholi Chak No.2
Taluk / tehsilChamorshi
DistrictGadchiroli
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-04900

In context

30 applications in Gadchiroli since January 2022 are in the same category (Industry): 15 approved, 9 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1,076.5 acres, this one is larger than 70% of them.

21 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mudholi Chak No.2, Chamorshi, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from M/S. Lloyds Metals and Energy Limited in Gadchiroli

29 Lloyds Metals and Energy projects in Gadchiroli
All 40 Lloyds Metals and Energy projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.