Cleared for impact studyIndustry · Gadchiroli, Maharashtra

Proposed DRI based ISP to manufacture 0.5 MTPA of TMT Rebars comprising 0.825 MTPA DRI production (4x625 TPD DRI Kilns), Steel Making Facility (7×25T IFs, 2×25T LRFs, 2x2 Strand (6/11 m radius) CCMs, 30 TPH RHF) producing 0.521 MTPA Billets, 0.5 MTPA TMT Rebar by TMT Rebar Mill, Slag Crusher (Sand Making 1,00,000 TPA) and 125MW Captive Power Generation (75MW WHRB + 50MW AFBC)

Proposed DRI based ISP to manufacture 0.5 MTPA of TMT Rebars comprising 0.825 MTPA DRI production (4x625 TPD DRI Kilns), Steel Making Facility (7×25T IFs, 2×25T LRFs, 2x2 Strand (6/11 m radius) CCMs, 30 TPH RHF) producing 0.521 MTPA Billets, 0.5 MTPA TMT Rebar by TMT Rebar Mill, Slag Crusher (Sand Making 1,00,000 TPA) and 125MW Captive Power Generation (75MW WHRB + 50MW AFBC) is a proposed industrial project in Mudholi Chak No.1, Chamorshi, Gadchiroli, Maharashtra. The site covers 193.3 acres. Its stated project cost is ₹1,615 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 13 May 2026).

See it on the live map All projects in Gadchiroli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed DRI based ISP to manufacture 0.5 MTPA of TMT Rebars comprising 0.825 MTPA DRI production (4x625 TPD DRI Kilns), Steel Making Facility (7×25T IFs, 2×25T LRFs, 2x2 Strand (6/11 m radius) CCMs, 30 TPH RHF) producing 0.521 MTPA Billets, 0.5 MTPA TMT Rebar by TMT Rebar Mill, Slag Crusher (Sand Making 1,00,000 TPA) and 125MW Captive Power Generation (75MW WHRB + 50MW AFBC) is a proposed industrial project in Mudholi Chak No.1, Chamorshi, Gadchiroli, Maharashtra. The site covers 193.3 acres.

Who is building it?

The applicant is Saffron Hill Metals Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 13 May 2026), as of 27 Nov 2026.

Where is it?

In Mudholi Chak No.1, Chamorshi, Gadchiroli, Maharashtra.

How big is it?

It has a stated cost of ₹1,615 crore and a site of 193.3 acres.

When was it filed?

The application was filed on 12 May 2026.

Project details

Official titleEstablishment of proposed DRI based ISP to manufacture 0.5 MTPA of TMT Rebars comprising 0.825 MTPA DRI production (4x625 TPD DRI Kilns), Steel Making Facility (7×25T IFs, 2×25T LRFs, 2x2 Strand (6/11 m radius) CCMs, 30 TPH RHF) producing 0.521 MTPA Billets, 0.5 MTPA TMT Rebar by TMT Rebar Mill, Slag Crusher (Sand Making 1,00,000 TPA) and 125MW Captive Power Generation (75MW WHRB + 50MW AFBC) at MIDC Village Mudholi Chak No.1, Teh. Chamorshi, Dist. Gadchiroli, M.S. by Saffron Hill Metals Pvt Ltd
StatusCleared for impact study
Status since13 May 2026
Application filed12 May 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantSaffron Hill Metals Private Limited
Land area193.3 acres (78.2 ha)
Project cost₹1,615 crore
Village / localityMudholi Chak No.1
Taluk / tehsilChamorshi
DistrictGadchiroli
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-13534

In context

30 applications in Gadchiroli since January 2022 are in the same category (Industry): 15 approved, 9 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 193.3 acres, this one is smaller than 77% of them.

18 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mudholi Chak No.1, Chamorshi, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.