What is this project?
Proposed DRI based ISP to manufacture 0.5 MTPA of TMT Rebars comprising 0.825 MTPA DRI production (4x625 TPD DRI Kilns), Steel Making Facility (7×25T IFs, 2×25T LRFs, 2x2 Strand (6/11 m radius) CCMs, 30 TPH RHF) producing 0.521 MTPA Billets, 0.5 MTPA TMT Rebar by TMT Rebar Mill, Slag Crusher (Sand Making 1,00,000 TPA) and 125MW Captive Power Generation (75MW WHRB + 50MW AFBC) is a proposed industrial project in Mudholi Chak No.1, Chamorshi, Gadchiroli, Maharashtra. The site covers 193.3 acres.
Who is building it?
The applicant is Saffron Hill Metals Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 13 May 2026), as of 27 Nov 2026.
Where is it?
In Mudholi Chak No.1, Chamorshi, Gadchiroli, Maharashtra.
How big is it?
It has a stated cost of ₹1,615 crore and a site of 193.3 acres.
When was it filed?
The application was filed on 12 May 2026.
Project details
| Official title | Establishment of proposed DRI based ISP to manufacture 0.5 MTPA of TMT Rebars comprising 0.825 MTPA DRI production (4x625 TPD DRI Kilns), Steel Making Facility (7×25T IFs, 2×25T LRFs, 2x2 Strand (6/11 m radius) CCMs, 30 TPH RHF) producing 0.521 MTPA Billets, 0.5 MTPA TMT Rebar by TMT Rebar Mill, Slag Crusher (Sand Making 1,00,000 TPA) and 125MW Captive Power Generation (75MW WHRB + 50MW AFBC) at MIDC Village Mudholi Chak No.1, Teh. Chamorshi, Dist. Gadchiroli, M.S. by Saffron Hill Metals Pvt Ltd |
|---|---|
| Status | Cleared for impact study |
| Status since | 13 May 2026 |
| Application filed | 12 May 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Saffron Hill Metals Private Limited |
| Land area | 193.3 acres (78.2 ha) |
| Project cost | ₹1,615 crore |
| Village / locality | Mudholi Chak No.1 |
| Taluk / tehsil | Chamorshi |
| District | Gadchiroli |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-13534 |
In context
30 applications in Gadchiroli since January 2022 are in the same category (Industry): 15 approved, 9 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 193.3 acres, this one is smaller than 77% of them.
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mudholi Chak No.1, Chamorshi, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Greenfield 3.0 MTPA Integrated Steel Plant (1x1.5 MTPA Coke Oven… — cleared for impact study, 600 m away
- Proposed 0.9 MTPA Steel Plant comprising 0.693 MTPA DRI (6x350 TPA DRI Kiln),… — cleared for impact study, 700 m away
- 3 x 600 TPD (6,12,000 TPA) Sponge Iron Plant, 8x25 T (6,66,000 TPA) Induction… — environmental approval granted, 1.6 km away
- 3 x 600 TPD (6,12,000 TPA) Sponge Iron Plant, 8x25 T (6,66,000 TPA) Induction… — cleared for impact study, 1.6 km away
- Proposed Diversion of Forest Land Over 13.726 Ha for Proposed Railway Line and… — not approved, 2 km away
- Proposed Steel Plant (Green Field) with 8 × 650 TPD DRI Kilns-Sponge Iron… — cleared for impact study, 2.4 km away
- Environmental Clearance for Proposed River Bed Sand Mining Having Leases Area… — environmental approval granted, 3.4 km away
- Transfer of EC of Jairampur sand ghat on Wainganga River Tq. Chamorshi Dist.… — environmental approval granted, 3.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.