Quick answers
What is this project?
Proposed 1.2 MTPA Integrated Steel Plant at Survey Nos. 2, 3, 4, 5, 6 & Others of Village Kishtapur, Tahsil Chamorshi, District Gadchiroli, Maharashtra by M/s Kirtisagar Metalloys Private Limited is a proposed industrial project in Kishtapur, Chamorshi, Gadchiroli, Maharashtra. The site covers 374.1 acres.
Who is building it?
The applicant is Kirtisagar Metalloys Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Kishtapur, Chamorshi, Gadchiroli, Maharashtra.
How big is it?
It has a stated cost of ₹6,900 crore and a site of 374.1 acres.
When was it filed?
The application was filed on 16 May 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 27 Jun 2026 |
| Application filed | 16 May 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Kirtisagar Metalloys Private Limited |
| Land area | 374.1 acres (151.4 ha) |
| Project cost | ₹6,900 crore |
| Village / locality | Kishtapur |
| Taluk / tehsil | Chamorshi |
| District | Gadchiroli |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-11649 |
In context
30 applications in Gadchiroli since January 2022 are in the same category (Industry): 15 approved, 9 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 374.1 acres, this one is larger than 57% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kishtapur, Chamorshi, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Steel Plant (Green Field) with 8 × 650 TPD DRI Kilns-Sponge Iron… — cleared for impact study, 3.8 km away
- Proposed 1.8 MTPA Integrated Plant (0.9 MTPA DRI Plant (6x450 TPD) and 0.9… — under environmental review, 4.2 km away
- Proposed 1.8 MTPA Integrated Plant (0.9 MTPA DRI Plant (6x450 TPD) & 0.9 MTPA… — returned to applicant, 4.3 km away
- 3 x 600 TPD (6,12,000 TPA) Sponge Iron Plant, 8x25 T (6,66,000 TPA) Induction… — environmental approval granted, 5 km away
- 3 x 600 TPD (6,12,000 TPA) Sponge Iron Plant, 8x25 T (6,66,000 TPA) Induction… — cleared for impact study, 5 km away
- Proposed 0.9 MTPA Steel Plant comprising 0.693 MTPA DRI (6x350 TPA DRI Kiln),… — cleared for impact study, 5.3 km away
- Proposed DRI based ISP to manufacture 0.5 MTPA of TMT Rebars comprising 0.825… — cleared for impact study, 5.9 km away
- Proposed Greenfield 3.0 MTPA Integrated Steel Plant (1x1.5 MTPA Coke Oven… — cleared for impact study, 6.5 km away