Proposed for Enhancement of Production Capacity and Change in Configuration of the Existing Iron Ore Pelletization Plant From 0.75 Mtpa to 0.85 Mtpa Without Changing Other Plant Facilities Granted in Ec and Nipl Within the Existing Plant Premises by M/S Msp Sponge and Iron Limited is a proposed industrial building project in Bannamaruni, Kendujhar Sadar, Kendujhar, Odisha. The site covers 74.2 acres.
Who is building it?
The applicant is Msp Sponge Iron.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Bannamaruni, Kendujhar Sadar, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹72,199.3 crore and a site of 74.2 acres.
When was it filed?
The application was filed on 11 Nov 2024.
Project details
| Official title | Proposed for Enhancement of Production Capacity and Change in Configuration of the Existing Iron Ore Pelletization Plant From 0.75 Mtpa to 0.85 Mtpa Without Changing Other Plant Facilities Granted in Ec and Nipl Within the Existing Plant Premises at Village: Haldiaguna, P.O. -Gobardhan, District: Keonjhar – 758013, Odisha by M/S Msp Sponge and Iron Limited. |
|---|---|
| Status | Initial checks |
| Status since | 11 Nov 2024 |
| Application filed | 11 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Msp Sponge Iron |
| Use | Industrial |
| Land area | 74.2 acres (30 ha) |
| Plot area | 3,00,200 m² (32,31,323 sq ft) |
| Project cost | ₹72,199.3 crore |
| Village / locality | Bannamaruni |
| Taluk / tehsil | Kendujhar Sadar |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01231 |
In context
9 applications in Kendujhar since January 2022 are in the same category (Buildings & townships): 1 approved, 5 filed or under review, and 1 withdrawn, lapsed or rejected.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bannamaruni, Kendujhar Sadar, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Capacity Enhancement of Existing Hot Rolling Mill Capacity From 52,000 Tpa to… — initial checks, 0 m away
- Expansion of existing Integrated steel plant to final capacity of Iron Ore… — lapsed, 100 m away
- Expansion of existing Integrated steel plant to final capacity of Iron Ore… — cleared for impact study, 100 m away
- Proposed Enhancement of Production Capacity of (2 × 100 Tpd) Dri From 60,000… — initial checks, 2.7 km away
- Amendment & Extension of validity of ToR by addition of "a slag crusher unit… — lapsed, 4.7 km away
- Name Change (Transfer) of the Environment Clearance (EC File no.… — lapsed, 4.8 km away
- Expansion of existing Facility of Sponge iron from 2,60,000 TPA to 11,18,000… — lapsed, 4.8 km away
- Transfer of Environment Clearance of Tikarapada Stone Quarry-1 Over an Area of… — environmental approval granted, 8.3 km away