Quick answers
What is this project?
Name Change (Transfer) of the Environment Clearance (EC File no. J-11011/134/2006-IA II (I), Dt. 19.07.2006 and subsequently amended on 05.10.2007) from M/s Orissa Sponge Iron Ltd. to M/s Orissa Sponge Iron & Steel Limited is a lapsed industrial project in Spanjap>Tana, Kendujhar Sadar, Kendujhar, Odisha. The site covers 350 acres.
Who is building it?
The applicant is Orissa Sponge Iron and Steel Limited.
Has it been approved?
No. The application was lapsed on 19 Feb 2026, so it is no longer under consideration.
Where is it?
In Spanjap>Tana, Kendujhar Sadar, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹374.4 crore and a site of 350 acres.
When was it filed?
The application was filed on 17 Jan 2026.
Project details
| Official title | Name Change (Transfer) of the Environment Clearance (EC File no. J-11011/134/2006-IA II (I), Dt. 19.07.2006 and subsequently amended on 05.10.2007) from M/s Orissa Sponge Iron Ltd. to M/s Orissa Sponge Iron & Steel Limited, located at Village - Palaspanga, Dist.- Keonjhar, State- Odisha as per change of name of the same company in Registrar of Companies(ROC), Cuttack, Odisha. |
|---|---|
| Status | Lapsed |
| Status since | 19 Feb 2026 |
| Application filed | 17 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Orissa Sponge Iron and Steel Limited |
| Land area | 350 acres (141.6 ha) |
| Project cost | ₹374.4 crore |
| Village / locality | Spanjap>Tana |
| Taluk / tehsil | Kendujhar Sadar |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03858 |
In context
38 applications in Kendujhar since January 2022 are in the same category (Industry): 9 approved, 12 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 350 acres, this one is larger than 87% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Spanjap>Tana, Kendujhar Sadar, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing Facility of Sponge iron from 2,60,000 TPA to 11,18,000… — lapsed, 0 m away
- Amendment & Extension of validity of ToR by addition of "a slag crusher unit… — lapsed, 50 m away
- Proposed Enhancement of Production Capacity of (2 × 100 Tpd) Dri From 60,000… — initial checks, 3.6 km away
- Expansion of existing Integrated steel plant to final capacity of Iron Ore… — lapsed, 4.7 km away
- Expansion of existing Integrated steel plant to final capacity of Iron Ore… — cleared for impact study, 4.7 km away
- Proposed for Enhancement of Production Capacity and Change in Configuration of… — initial checks, 4.8 km away
- Capacity Enhancement of Existing Hot Rolling Mill Capacity From 52,000 Tpa to… — initial checks, 4.8 km away
- Submission of Replenishment Study Report for Tele Arshala Sand Bed over an… — environmental approval granted, 5.1 km away
More from Orissa Sponge Iron and Steel Limited in Kendujhar
- Expansion of existing Facility of Sponge iron from 2,60,000 TPA to 11,18,000… — lapsed
- Amendment & Extension of validity of ToR by addition of "a slag crusher unit… — lapsed
All 3 Orissa Sponge Iron and Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.