Quick answers
What is this project?
Proposed Enhancement of Production Capacity of (2 × 100 Tpd) Dri From 60,000 Tpa to 70,000 Tpa and Installation of Fly Ash Brick Plant of 86 Tpd (28,380 Tpa) Under "no Increase in Pollution Load" is a proposed industrial project in P>Tunga, Kendujhar Sadar, Kendujhar, Odisha. The site covers 47.2 acres.
Who is building it?
The applicant is Brand Steel & Power Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In P>Tunga, Kendujhar Sadar, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹190 crore and a site of 47.2 acres.
When was it filed?
The application was filed on 1 Sept 2025.
Project details
| Status | Initial checks |
|---|---|
| Status since | 1 Sept 2025 |
| Application filed | 1 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Brand Steel & Power Private Limited |
| Land area | 47.2 acres (19.1 ha) |
| Project cost | ₹190 crore |
| Village / locality | P>Tunga |
| Taluk / tehsil | Kendujhar Sadar |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02326 |
In context
38 applications in Kendujhar since January 2022 are in the same category (Industry): 9 approved, 12 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 47.2 acres, this one is smaller than 76% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
P>Tunga, Kendujhar Sadar, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed for Enhancement of Production Capacity and Change in Configuration of… — initial checks, 2.7 km away
- Capacity Enhancement of Existing Hot Rolling Mill Capacity From 52,000 Tpa to… — initial checks, 2.7 km away
- Expansion of existing Integrated steel plant to final capacity of Iron Ore… — lapsed, 2.7 km away
- Expansion of existing Integrated steel plant to final capacity of Iron Ore… — cleared for impact study, 2.7 km away
- Amendment & Extension of validity of ToR by addition of "a slag crusher unit… — lapsed, 3.6 km away
- Name Change (Transfer) of the Environment Clearance (EC File no.… — lapsed, 3.6 km away
- Expansion of existing Facility of Sponge iron from 2,60,000 TPA to 11,18,000… — lapsed, 3.6 km away
- Diversion of 2.048 Ha Forest area involved for construction of 33 kV… — more information requested, 8.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.