Quick answers
What is this project?
Amendment & Extension of validity of ToR by addition of "a slag crusher unit of 1x16TPH capacity" in the approved TOR configuration [Expansion of Sponge iron-260000TPA to 676500TPA, Billets-100000TPA to 700000TPA, CPP-37.2MW to 102.2MW with addition of Hot Rolling Mill-500000TPA, Reheating Furnace (standby)-1x25TPH, Cold Rolling Mill-500000TPA (Galvanized sheets & Colour Coated sheets)] by Orissa Sponge Iron and Steel Limited is a lapsed industrial project in >H>Rapasi, Kendujhar Sadar, Kendujhar, Odisha. The site covers 366.5 acres.
Who is building it?
The applicant is Orissa Sponge Iron and Steel Limited.
Has it been approved?
No. The application was lapsed on 31 Jan 2026, so it is no longer under consideration.
Where is it?
In >H>Rapasi, Kendujhar Sadar, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹800 crore and a site of 366.5 acres.
When was it filed?
The application was filed on 19 Aug 2025.
Project details
| Official title | Amendment & Extension of validity of ToR by addition of "a slag crusher unit of 1x16TPH capacity" in the approved TOR configuration [Expansion of Sponge iron-260000TPA to 676500TPA, Billets-100000TPA to 700000TPA, CPP-37.2MW to 102.2MW with addition of Hot Rolling Mill-500000TPA, Reheating Furnace (standby)-1x25TPH, Cold Rolling Mill-500000TPA (Galvanized sheets & Colour Coated sheets)] by Orissa Sponge Iron and Steel Limited located at village–Palaspanga, Block–Kendujhar, Dist–Keonjhar, Odisha |
|---|---|
| Status | Lapsed |
| Status since | 31 Jan 2026 |
| Application filed | 19 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Orissa Sponge Iron and Steel Limited |
| Land area | 366.5 acres (148.3 ha) |
| Project cost | ₹800 crore |
| Village / locality | >H>Rapasi |
| Taluk / tehsil | Kendujhar Sadar |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02492 |
In context
38 applications in Kendujhar since January 2022 are in the same category (Industry): 9 approved, 12 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 366.5 acres, this one is larger than 89% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
>H>Rapasi, Kendujhar Sadar, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Name Change (Transfer) of the Environment Clearance (EC File no.… — lapsed, 50 m away
- Expansion of existing Facility of Sponge iron from 2,60,000 TPA to 11,18,000… — lapsed, 50 m away
- Proposed Enhancement of Production Capacity of (2 × 100 Tpd) Dri From 60,000… — initial checks, 3.6 km away
- Expansion of existing Integrated steel plant to final capacity of Iron Ore… — lapsed, 4.7 km away
- Expansion of existing Integrated steel plant to final capacity of Iron Ore… — cleared for impact study, 4.7 km away
- Proposed for Enhancement of Production Capacity and Change in Configuration of… — initial checks, 4.7 km away
- Capacity Enhancement of Existing Hot Rolling Mill Capacity From 52,000 Tpa to… — initial checks, 4.7 km away
- Submission of Replenishment Study Report for Tele Arshala Sand Bed over an… — environmental approval granted, 5.2 km away
More from Orissa Sponge Iron and Steel Limited in Kendujhar
- Name Change (Transfer) of the Environment Clearance (EC File no.… — lapsed
- Expansion of existing Facility of Sponge iron from 2,60,000 TPA to 11,18,000… — lapsed
All 3 Orissa Sponge Iron and Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.