LapsedIndustry · Kendujhar, Odisha

Expansion of existing Facility of Sponge iron from 2,60,000 TPA to 11,18,000 TPA, Billets from 0.1 MTPA to 0.8 MTPA, CPP from 37.2 MW to 157.2 MW with addition of new Hot Rolling Mill of 0.8 MTPA, new Cold Rolling Complex of 0.5 MTPA, new Slag Crusher of 1x18 TPH by M/s. Orissa Sponge Iron and Steel Limited

Expansion of existing Facility of Sponge iron from 2,60,000 TPA to 11,18,000 TPA, Billets from 0.1 MTPA to 0.8 MTPA, CPP from 37.2 MW to 157.2 MW with addition of new Hot Rolling Mill of 0.8 MTPA, new Cold Rolling Complex of 0.5 MTPA, new Slag Crusher of 1x18 TPH by M/s. Orissa Sponge Iron and Steel Limited is a lapsed industrial project in >H>Rapasi, Kendujhar Sadar, Kendujhar, Odisha. The site covers 378.5 acres. Its stated project cost is ₹1,726.5 crore. As of 27 Nov 2026, its status is “Lapsed” (since 31 Jan 2026).

See it on the live map All projects in Kendujhar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of existing Facility of Sponge iron from 2,60,000 TPA to 11,18,000 TPA, Billets from 0.1 MTPA to 0.8 MTPA, CPP from 37.2 MW to 157.2 MW with addition of new Hot Rolling Mill of 0.8 MTPA, new Cold Rolling Complex of 0.5 MTPA, new Slag Crusher of 1x18 TPH by M/s. Orissa Sponge Iron and Steel Limited is a lapsed industrial project in >H>Rapasi, Kendujhar Sadar, Kendujhar, Odisha. The site covers 378.5 acres.

Who is building it?

The applicant is Orissa Sponge Iron and Steel Limited.

Has it been approved?

No. The application was lapsed on 31 Jan 2026, so it is no longer under consideration.

Where is it?

In >H>Rapasi, Kendujhar Sadar, Kendujhar, Odisha.

How big is it?

It has a stated cost of ₹1,726.5 crore and a site of 378.5 acres.

When was it filed?

The application was filed on 25 Oct 2025.

Project details

Official titleExpansion of existing Facility of Sponge iron from 2,60,000 TPA to 11,18,000 TPA, Billets from 0.1 MTPA to 0.8 MTPA, CPP from 37.2 MW to 157.2 MW with addition of new Hot Rolling Mill of 0.8 MTPA, new Cold Rolling Complex of 0.5 MTPA, new Slag Crusher of 1x18 TPH by M/s. Orissa Sponge Iron and Steel Limited located at village – Palaspanga, Dist. – Keonjhar, Odisha.
StatusLapsed
Status since31 Jan 2026
Application filed25 Oct 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantOrissa Sponge Iron and Steel Limited
Land area378.5 acres (153.2 ha)
Project cost₹1,726.5 crore
Village / locality>H>Rapasi
Taluk / tehsilKendujhar Sadar
DistrictKendujhar
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-02645

In context

38 applications in Kendujhar since January 2022 are in the same category (Industry): 9 approved, 12 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 378.5 acres, this one is larger than 92% of them.

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

>H>Rapasi, Kendujhar Sadar, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Orissa Sponge Iron and Steel Limited in Kendujhar

All 3 Orissa Sponge Iron and Steel projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.