Quick answers
What is this project?
Expansion of 5.6 Mtpa Steel Plant Through Change in Product Mix by Establishing 2.6 Mtpa Crm Complex for Value Addition in Hot Rolled Coil Without Changing the Overall Production Capacity is an approved industrial project in Ganthigaria, Banarpal, Anugul, Odisha. The site covers 29.7 acres.
Who is building it?
The applicant is Tata Steel Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 14 Aug 2024), as of 27 Nov 2026.
Where is it?
In Ganthigaria, Banarpal, Anugul, Odisha.
How big is it?
It has a stated cost of ₹801.3 crore and a site of 29.7 acres.
When was it filed?
The application was filed on 19 Jun 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Aug 2024 |
| Application filed | 19 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Tata Steel Limited |
| Land area | 29.7 acres (12 ha) |
| Project cost | ₹801.3 crore |
| Village / locality | Ganthigaria |
| Taluk / tehsil | Banarpal |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00851 |
In context
17 applications in Anugul since January 2022 are in the same category (Industry): 11 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 29.7 acres, this one is smaller than 71% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ganthigaria, Banarpal, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Integrated Steel Plant from 5.6 MTPA Crude Steel to 7.1 MTPA… — lapsed, 450 m away
- Transfer of Environment Clearance titled "Expansion of Integrated Steel Plant… — lapsed, 800 m away
- Transfer of Environment Clearance titled "Expansion of Integrated Steel Plant… — lapsed, 800 m away
- Name change in EC for expansion of existing (2X150) 300 MW TPP by installation… — environmental approval granted, 850 m away
- Environmental Clearance for Production of country Liquor from the… — environmental approval granted, 5.1 km away
- Proposed Industrial Building having total built up area 28662.77 Sqm over… — environmental approval granted, 7.6 km away
- Proposed Expansion of the Existing 1,200 MW (10x120 MW) Sub-critical Captive… — returned to applicant, 8.7 km away
- Haturipal Brahmani Sand Quarry over an area of 11.80 Acre or 4.77 Ha — environmental approval granted, 10.3 km away
More from Tata Steel Limited in Anugul
- Expansion of Integrated Steel Plant from 5.6 MTPA Crude Steel to 7.1 MTPA… — lapsed
- Transfer of Environment Clearance titled "Expansion of Integrated Steel Plant… — lapsed
- Transfer of Environment Clearance titled "Expansion of Integrated Steel Plant… — lapsed
4 Tata Steel projects in Anugul
All 104 Tata Steel projects across India
About this information