Quick answers
What is this project?
Name change in EC for expansion of existing (2X150) 300 MW TPP by installation of (165+20) 185 MW coal based TPP form M/s. Angul Energy Limited to "M/s. Tata Steel Limited, TSM-CPP" is an approved power project in Birabahanpur, Banarpal, Anugul, Odisha. The site covers 100 acres.
Who is building it?
The applicant is Angul Energy LTD..
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 4 Jan 2025), as of 27 Nov 2026.
Where is it?
In Birabahanpur, Banarpal, Anugul, Odisha.
How big is it?
It has a stated cost of ₹1,123.3 crore and a site of 100 acres.
When was it filed?
The application was filed on 7 Nov 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 4 Jan 2025 |
| Application filed | 7 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Power |
| Applicant | Angul Energy LTD. |
| Land area | 100 acres (40.5 ha) |
| Project cost | ₹1,123.3 crore |
| Village / locality | Birabahanpur |
| Taluk / tehsil | Banarpal |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01511 |
In context
17 applications in Anugul since January 2022 are in the same category (Power): 7 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 100 acres, this one is smaller than 87% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Birabahanpur, Banarpal, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of 5.6 Mtpa Steel Plant Through Change in Product Mix by… — environmental approval granted, 850 m away
- Expansion of Integrated Steel Plant from 5.6 MTPA Crude Steel to 7.1 MTPA… — lapsed, 850 m away
- Transfer of Environment Clearance titled "Expansion of Integrated Steel Plant… — lapsed, 1.2 km away
- Transfer of Environment Clearance titled "Expansion of Integrated Steel Plant… — lapsed, 1.2 km away
- Environmental Clearance for Production of country Liquor from the… — environmental approval granted, 4.5 km away
- Proposed Industrial Building having total built up area 28662.77 Sqm over… — environmental approval granted, 7.4 km away
- Proposed Expansion of the Existing 1,200 MW (10x120 MW) Sub-critical Captive… — returned to applicant, 8.2 km away
- Haturipal Brahmani Sand Quarry over an area of 11.80 Acre or 4.77 Ha — environmental approval granted, 9.4 km away
About this information