Quick answers
What is this project?
Transfer of Environment Clearance titled "Expansion of Integrated Steel Plant (3.1 to 5.6 MTPA) at Meramandali, District Dhenkanal, Odisha is a lapsed industrial project in Birabahanpur, Banarpal, Anugul, Odisha. The site covers 1,664.5 acres.
Who is building it?
The applicant is Tata Steel Limited.
Has it been approved?
No. The application was lapsed on 20 Mar 2026, so it is no longer under consideration.
Where is it?
In Birabahanpur, Banarpal, Anugul, Odisha.
How big is it?
It has a stated cost of ₹27,986.2 crore and a site of 1,664.5 acres.
When was it filed?
The application was filed on 11 Feb 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 20 Mar 2026 |
| Application filed | 11 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Tata Steel Limited |
| Land area | 1,664.5 acres (673.6 ha) |
| Project cost | ₹27,986.2 crore |
| Village / locality | Birabahanpur |
| Taluk / tehsil | Banarpal |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03587 |
In context
17 applications in Anugul since January 2022 are in the same category (Industry): 11 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 1,664.5 acres, this one is larger than 65% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Birabahanpur, Banarpal, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of Environment Clearance titled "Expansion of Integrated Steel Plant… — lapsed, 0 m away
- Expansion of Integrated Steel Plant from 5.6 MTPA Crude Steel to 7.1 MTPA… — lapsed, 400 m away
- Expansion of 5.6 Mtpa Steel Plant Through Change in Product Mix by… — environmental approval granted, 800 m away
- Name change in EC for expansion of existing (2X150) 300 MW TPP by installation… — environmental approval granted, 1.2 km away
- Environmental Clearance for Production of country Liquor from the… — environmental approval granted, 5.7 km away
- Proposed Industrial Building having total built up area 28662.77 Sqm over… — environmental approval granted, 8.3 km away
- Proposed Expansion of the Existing 1,200 MW (10x120 MW) Sub-critical Captive… — returned to applicant, 9.4 km away
- Haturipal Brahmani Sand Quarry over an area of 11.80 Acre or 4.77 Ha — environmental approval granted, 10.4 km away
More from Tata Steel Limited in Anugul
- Expansion of Integrated Steel Plant from 5.6 MTPA Crude Steel to 7.1 MTPA… — lapsed
- Transfer of Environment Clearance titled "Expansion of Integrated Steel Plant… — lapsed
- Expansion of 5.6 Mtpa Steel Plant Through Change in Product Mix by… — environmental approval granted
4 Tata Steel projects in Anugul
All 104 Tata Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.