Quick answers
What is Marara Sand Mining Project over an extent of 1.60Ha.?
Marara Sand Mining Project over an extent of 1.60Ha is an approved mining project in Adalatgarh, Pathankot, Punjab. The site covers 4 acres.
Who is building it?
The applicant is Department of Irrigation.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Oct 2023), as of 27 Nov 2026.
Where is it?
In Adalatgarh, Pathankot, Punjab.
How big is it?
It has a stated cost of ₹52 lakh and a site of 4 acres.
When was it filed?
The application was filed on 11 Oct 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Oct 2023 |
| Application filed | 11 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Department of Irrigation |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹52 lakh |
| Village / locality | Adalatgarh |
| Taluk / tehsil | Pathankot |
| District | Pathankot |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00037 |
In context
109 applications in Pathankot since January 2022 are in the same category (Mining): 55 approved, 42 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 4 acres, this one is smaller than 84% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Adalatgarh, Pathankot, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining of Minor Minerals i.e. RBM/ Gravel from the river bed having mining… — under environmental review, 5.2 km away
- Mining of Minor Minerals i.e. RBM/ Gravel from the river bed having mining… — cleared for impact study, 5.2 km away
- Proposed Sand Mining Project (Boulder, Gravel, Sand) As Per Dsr No.… — environmental approval granted, 5.3 km away
- Proposed Sand Mining Project (Boulder, Gravel, Sand) As Per Dsr No.… — lapsed, 5.3 km away
- Proposed Sand Mining Project (Boulder, Gravel, Sand) As Per Dsr No.… — environmental approval granted, 5.3 km away
- Proposed Sand Mining Project (Boulder, Gravel, Sand) As Per Dsr No.… — cleared for impact study, 5.3 km away
- (Rvsf) Registered Vehicle Scrapping Facility — more information requested, 5.4 km away
- Amendment in Environmental Clearance Granted by Seiaa, Punjab Vide File No.… — lapsed, 5.5 km away
More from Department of Irrigation in Pathankot
- Amendment in Environmental Clearance Granted by Seiaa, Punjab Vide File No.… — lapsed
- Proposed Sand Mining Project (Boulder, Gravel, Sand) As Per Dsr No.… — withdrawn
- Mining of minor mineral i.e.RBM from the bed of river Ravi — withdrawn
- Proposed RBM mining project having an area 4.14 Ha — lapsed
- The Proposed Project Involves Mining of Minor Mineral I.E. Rbm From the Bed of… — lapsed
- The Proposed Project Involves Mining of Minor Mineral I.E. Rbm From the Bed of… — cleared for impact study
15 Department of Irrigation, Punjab projects in Pathankot
All 157 Department of Irrigation, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.