What is Developing? Open the mapMap

Cleared for impact studyMining · Jalaun, Uttar Pradesh

Tarivulda Sand/Morrum Mining Project on Yamuna River

Tarivulda Sand/Morrum Mining Project on Yamuna River is a proposed mining project in Kalpi, Jalaun, Uttar Pradesh. The site covers 49.9 acres. Its stated project cost is ₹78 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 20 Feb 2023).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Tarivulda Sand/Morrum Mining Project on Yamuna River?

Tarivulda Sand/Morrum Mining Project on Yamuna River is a proposed mining project in Kalpi, Jalaun, Uttar Pradesh. The site covers 49.9 acres.

Who is building it?

The applicant is Aatif Iqbal.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 20 Feb 2023), as of 27 Nov 2026.

Where is it?

In Kalpi, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹78 lakh and a site of 49.9 acres.

When was it filed?

The application was filed on 20 Feb 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Tarivulda Sand/Morrum Mining Project on Yamuna River

Project details

StatusCleared for impact study
Status since20 Feb 2023
Application filed20 Feb 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAatif Iqbal
Land area49.9 acres (20.2 ha)
Project cost₹78 lakh
Village / localityKalpi
Taluk / tehsilKalpi
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00773

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 12 Sept 2023Environmental approval granted49.9 acres₹78 lakh
Early planning filed 20 Feb 2023 (this page)Cleared for impact study49.9 acres₹78 lakh

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 49.9 acres, this one is larger than 64% of them.

No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.

Where it is

Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.