Quick answers
What is Tarivulda Sand/Morrum Mining Project on Yamuna River?
Tarivulda Sand/Morrum Mining Project on Yamuna River is an approved mining project in Kalpi, Jalaun, Uttar Pradesh. The site covers 49.9 acres.
Who is building it?
The applicant is Aatif Iqbal.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Sept 2023), as of 27 Nov 2026.
Where is it?
In Kalpi, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹78 lakh and a site of 49.9 acres.
When was it filed?
The application was filed on 12 Sept 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Sept 2023 |
| Application filed | 12 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Aatif Iqbal |
| Land area | 49.9 acres (20.2 ha) |
| Project cost | ₹78 lakh |
| Village / locality | Kalpi |
| Taluk / tehsil | Kalpi |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01201 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Sept 2023 (this page) | Environmental approval granted | 49.9 acres | ₹78 lakh |
| Early planning filed 20 Feb 2023 | Cleared for impact study | 49.9 acres | ₹78 lakh |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 49.9 acres, this one is larger than 64% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tarivulda Sand/Morrum Mining Project on Yamuna River — cleared for impact study, 0 m away
- Proposed forest Land to be diverted for Construction of Drain & Landscaping… — lapsed, 3.1 km away
- Proposed Project of "Sand/Morrum Mine" located at Gata No. 169/9 (Khand- 07),… — cleared for impact study, 4.8 km away
- Proposed Project of riverbed "Morrum Mining" on the riverbed of Yamuna River… — under environmental review, 4.8 km away
- Proposed Project of riverbed "Morrum Mining" on the riverbed of Yamuna River… — cleared for impact study, 4.8 km away
- Proposed Project of "Sand/Morrum Mine" located at Gata No. 169/9 (Khand- 07),… — cleared for impact study, 4.8 km away
- Sand/Morrum Mining along Yamuna Riverbed" at Gata No. 169/9, 170/1, Khand… — under environmental review, 5.8 km away
- SAND/MORRUM MINING ALONG YAMUNA RIVERBED OVER AN AREA OF 15 ha. AT GATA NO.… — under environmental review, 6.1 km away