Quick answers
What is this project?
Proposed forest Land to be diverted for Construction of Drain & Landscaping Work along the Shivpuri-Bhognipur Road (Old NH-27, City Part), at Nagar Palika Bazar is a lapsed road project in Alampur, Kalpi, Jalaun, Uttar Pradesh. The site covers 0.7 acres.
Who is building it?
The applicant is Nagar Palika Parishad Kalpi Jalaun.
Has it been approved?
No. The application was lapsed on 17 Nov 2026, so it is no longer under consideration.
Where is it?
In Alampur, Kalpi, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹25 lakh; a site of 0.7 acres and 900 m² of forest land.
When was it filed?
The application was filed on 16 Oct 2026.
Project details
| Official title | Proposed forest Land to be diverted for Construction of Drain & Landscaping Work along the Shivpuri-Bhognipur Road (Old NH-27, City Part), at Nagar Palika Bazar, in District: Jalaun (Uttar Pradesh). |
|---|---|
| Status | Lapsed |
| Status since | 17 Nov 2026 |
| Application filed | 16 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Nagar Palika Parishad Kalpi Jalaun |
| Land area | 3,000 m² |
| Forest land | 900 m² |
| Project cost | ₹25 lakh |
| Village / locality | Alampur |
| Taluk / tehsil | Kalpi |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07195 |
In context
10 applications in Jalaun since January 2022 are in the same category (Roads & highways): 0 approved, 6 filed or under review, and 4 withdrawn, lapsed or rejected. At 0.7 acres, this one is smaller than 100% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Alampur, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tarivulda Sand/Morrum Mining Project on Yamuna River — environmental approval granted, 3.1 km away
- Tarivulda Sand/Morrum Mining Project on Yamuna River — cleared for impact study, 3.1 km away
- Proposed Project of "Sand/Morrum Mine" located at Gata No. 169/9 (Khand- 07),… — cleared for impact study, 5.7 km away
- Proposed Project of riverbed "Morrum Mining" on the riverbed of Yamuna River… — under environmental review, 5.7 km away
- Proposed Project of riverbed "Morrum Mining" on the riverbed of Yamuna River… — cleared for impact study, 5.7 km away
- Proposed Project of "Sand/Morrum Mine" located at Gata No. 169/9 (Khand- 07),… — cleared for impact study, 5.7 km away
- Sand/Morrum Mining along Yamuna Riverbed" at Gata No. 169/9, 170/1, Khand… — under environmental review, 6.8 km away
- SAND/MORRUM MINING ALONG YAMUNA RIVERBED OVER AN AREA OF 15 ha. AT GATA NO.… — under environmental review, 7.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.