Quick answers
What is Kharwanch Sand/Morrum Mining Project on Dhasan River?
Kharwanch Sand/Morrum Mining Project on Dhasan River is a proposed mining project in Dhamnor, Garautha, Jhansi, Uttar Pradesh. The site covers 30 acres.
Who is building it?
The applicant is M/S M P L Infra.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 6 Nov 2023), as of 27 Nov 2026.
Where is it?
In Dhamnor, Garautha, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹5.3 crore and a site of 30 acres.
When was it filed?
The application was filed on 6 Nov 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Kharwanch Sand/Morrum Mining Project on Dhasan River
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 6 Nov 2023 |
| Application filed | 6 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | M/S M P L Infra |
| Land area | 30 acres (12.2 ha) |
| Project cost | ₹5.3 crore |
| Village / locality | Dhamnor |
| Taluk / tehsil | Garautha |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01117 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Oct 2024 | Environmental approval granted | 30 acres | ₹5.3 crore |
| Early planning filed 6 Nov 2023 (this page) | Cleared for impact study | 30 acres | ₹5.3 crore |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 30 acres, this one is larger than 82% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Dhamnor, Garautha, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kharwanch Sand/Morrum Mining Project on Dhasan River — environmental approval granted, 0 m away
- "Sand/Morrum Mine" from Riverbed of Dhasan River, Village- Gadhar, Gata No.-… — under environmental review, 750 m away
- Proposed "Morrum" Mine Project at Gata No.- 908Na (Khand- 02), Village-… — under environmental review, 900 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River… — environmental approval granted, 2.6 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River… — cleared for impact study, 2.6 km away
- Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River… — under environmental review, 2.9 km away
- Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River… — cleared for impact study, 2.9 km away
- Environmental Clearance for Proposed Sand/Morrum Mining from Dhasan Riverbed… — lapsed, 3.9 km away
All 4 M P L Infra projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.