Quick answers
What is this project?
Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River at 01 Khand No. 07, Area 10.00 ha is a proposed mining project in Tola, Garautha, Jhansi, Uttar Pradesh. The site covers 410 acres.
Who is building it?
The applicant is Utsav Gupta.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Tola, Garautha, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹76 lakh and a site of 410 acres.
When was it filed?
The application was filed on 1 Apr 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River at 01…
Project details
| Official title | Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River at 01 Khand No. 07, Area 10.00 ha in Village- Tola Khangaran, Tehsil- Rath, District- Hamirpur, Uttar Pradesh ofM/s Anandeshwar Enterprises Private Limited, Director- Utsav Gupta |
|---|---|
| Status | Under environmental review |
| Status since | 18 May 2026 |
| Application filed | 1 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Utsav Gupta |
| Land area | 410 acres (165.9 ha) |
| Project cost | ₹76 lakh |
| Village / locality | Tola |
| Taluk / tehsil | Garautha |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04100 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Apr 2026 (this page) | Under environmental review | 410 acres | ₹76 lakh |
| Early planning filed 2 Jun 2025 | Cleared for impact study | 410 acres | ₹76 lakh |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 410 acres, this one is larger than 99% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Tola, Garautha, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River… — cleared for impact study, 0 m away
- Environmental Clearance for Proposed Sand/Morrum Mining from Dhasan Riverbed… — lapsed, 1.3 km away
- Morrum Mining from Dhasan River Bed — environmental approval granted, 1.3 km away
- Morrum Mining from Dhasan River Bed — cleared for impact study, 1.3 km away
- Kharwanch Sand/Morrum Mining Project on Dhasan River — cleared for impact study, 2.9 km away
- Kharwanch Sand/Morrum Mining Project on Dhasan River — environmental approval granted, 2.9 km away
- "Sand/Morrum Mine" from Riverbed of Dhasan River, Village- Gadhar, Gata No.-… — under environmental review, 3.2 km away
- Proposed "Morrum" Mine Project at Gata No.- 908Na (Khand- 02), Village-… — under environmental review, 3.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.