Quick answers
What is this project?
Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River at 01 Khand No. 07, Area 10.00 ha is a proposed mining project in Tola, Garautha, Jhansi, Uttar Pradesh. The site covers 410 acres.
Who is building it?
The applicant is Utsav Gupta.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 17 Oct 2025), as of 27 Nov 2026.
Where is it?
In Tola, Garautha, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹76 lakh and a site of 410 acres.
When was it filed?
The application was filed on 2 Jun 2025.
Project details
| Official title | Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River at 01 Khand No. 07, Area 10.00 ha in Village- Tola Khangaran, Tehsil- Rath, District- Hamirpur, Uttar Pradesh ofM/s Anandeshwar Enterprises Private Limited, Director- Utsav Gupta |
|---|---|
| Status | Cleared for impact study |
| Status since | 17 Oct 2025 |
| Application filed | 2 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Utsav Gupta |
| Land area | 410 acres (165.9 ha) |
| Project cost | ₹76 lakh |
| Village / locality | Tola |
| Taluk / tehsil | Garautha |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02688 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Apr 2026 | Under environmental review | 410 acres | ₹76 lakh |
| Early planning filed 2 Jun 2025 (this page) | Cleared for impact study | 410 acres | ₹76 lakh |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 410 acres, this one is larger than 99% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Tola, Garautha, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River… — under environmental review, 0 m away
- Environmental Clearance for Proposed Sand/Morrum Mining from Dhasan Riverbed… — lapsed, 1.3 km away
- Morrum Mining from Dhasan River Bed — environmental approval granted, 1.3 km away
- Morrum Mining from Dhasan River Bed — cleared for impact study, 1.3 km away
- Kharwanch Sand/Morrum Mining Project on Dhasan River — cleared for impact study, 2.9 km away
- Kharwanch Sand/Morrum Mining Project on Dhasan River — environmental approval granted, 2.9 km away
- "Sand/Morrum Mine" from Riverbed of Dhasan River, Village- Gadhar, Gata No.-… — under environmental review, 3.2 km away
- Proposed "Morrum" Mine Project at Gata No.- 908Na (Khand- 02), Village-… — under environmental review, 3.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.