Quick answers
What is this project?
Environmental Clearance for Proposed Sand/Morrum Mining from Dhasan Riverbed at Gata No. 1419 Kh Khand No.- 01, Village- Dhamnaud, Tehsil- Garautha ,District- Jhansi U.P., (Leased Area – 24.00 Ha) is a lapsed mining project in Dhamnor, Garautha, Jhansi, Uttar Pradesh. The site covers 59.3 acres.
Who is building it?
The applicant is Vipin Kumar Saxena.
Has it been approved?
No. The application was lapsed on 24 Feb 2025, so it is no longer under consideration.
Where is it?
In Dhamnor, Garautha, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.1 crore and a site of 59.3 acres.
When was it filed?
The application was filed on 8 Oct 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 24 Feb 2025 |
| Application filed | 8 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Vipin Kumar Saxena |
| Land area | 59.3 acres (24 ha) |
| Project cost | ₹1.1 crore |
| Village / locality | Dhamnor |
| Taluk / tehsil | Garautha |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01506 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 59.3 acres, this one is larger than 94% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Dhamnor, Garautha, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Morrum Mining from Dhasan River Bed — environmental approval granted, 0 m away
- Morrum Mining from Dhasan River Bed — cleared for impact study, 0 m away
- Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River… — under environmental review, 1.3 km away
- Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River… — cleared for impact study, 1.3 km away
- Sand/ Morrum Mining from Dhasan Riverbed — environmental approval granted, 3.8 km away
- Kharwanch Sand/Morrum Mining Project on Dhasan River — cleared for impact study, 3.9 km away
- Kharwanch Sand/Morrum Mining Project on Dhasan River — environmental approval granted, 3.9 km away
- "Sand/Morrum Mine" from Riverbed of Dhasan River, Village- Gadhar, Gata No.-… — under environmental review, 4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.