Quick answers
What is this project?
Proposed "Morrum" Mine Project at Gata No.- 908Na (Khand- 02), Village- Kharwanch, Tehsil- Garautha, District- Jhansi, U.P. (Applied Area: 20.0000 ha.), Applicant- Shri Siddharth Singh S/o Shri Ashok Singh is a proposed mining project in Kharwunch, Garautha, Jhansi, Uttar Pradesh. The site covers 49.4 acres.
Who is building it?
The applicant is Siddharth Singh.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Kharwunch, Garautha, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹72 lakh and a site of 49.4 acres.
When was it filed?
The application was filed on 26 Jun 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 13 Oct 2026 |
| Application filed | 26 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Siddharth Singh |
| Land area | 49.4 acres (20 ha) |
| Project cost | ₹72 lakh |
| Village / locality | Kharwunch |
| Taluk / tehsil | Garautha |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05012 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 49.4 acres, this one is larger than 91% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 113.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.
Where it is
Kharwunch, Garautha, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mine" from Riverbed of Dhasan River, Village- Gadhar, Gata No.-… — under environmental review, 350 m away
- Kharwanch Sand/Morrum Mining Project on Dhasan River — cleared for impact study, 900 m away
- Kharwanch Sand/Morrum Mining Project on Dhasan River — environmental approval granted, 900 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River… — environmental approval granted, 1.7 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River… — cleared for impact study, 1.7 km away
- Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River… — under environmental review, 3.6 km away
- Proposed project of Riverbed Sand/Morrum Mining from Riverbed of Dhasan River… — cleared for impact study, 3.6 km away
- Environmental Clearance for Proposed Sand/Morrum Mining from Dhasan Riverbed… — lapsed, 4.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.