Quick answers
What is this project?
Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail Outlet is a lapsed fuel station in Ibrahimpur, Najibabad, Bijnor, Uttar Pradesh. The site covers 0.7 acres.
Who is building it?
The applicant is Bharat Petroleum Corporation Limited (BPCL).
Has it been approved?
No. The application was lapsed on 18 Apr 2025, so it is no longer under consideration.
Where is it?
In Ibrahimpur, Najibabad, Bijnor, Uttar Pradesh.
How big is it?
It has a stated cost of ₹65 lakh; a site of 0.7 acres and 1,960 m² of forest land.
When was it filed?
The application was filed on 31 Aug 2024.
Project details
| Official title | Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail Outlet at Village:- Ibrahimpur Raju, Tehsil:- Najibabad, District:-Bijnor. |
|---|---|
| Status | Lapsed |
| Status since | 18 Apr 2025 |
| Application filed | 31 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 3,000 m² |
| Forest land | 1,960 m² |
| Project cost | ₹65 lakh |
| Village / locality | Ibrahimpur |
| Taluk / tehsil | Najibabad |
| District | Bijnor |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05223 |
In context
19 applications in Bijnor since January 2022 are in the same category (Fuel stations): 10 approved, 2 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0.7 acres, this one is smaller than 84% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ibrahimpur, Najibabad, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be diverted for Entry/Exit approach to M/s… — more information requested, 3.3 km away
- Mirpur Durg RBM Mining Project, Proponent Team Growth Private Limited, Prateek… — environmental approval granted, 3.8 km away
- Ordinary Soil Mine — initial checks, 6 km away
- "R.B.M. (In mix form) Mining" Project at Gata No.- 413, 414, 221, 222, 223,… — environmental approval granted, 7.9 km away
- "Proposed Project of Mining of RBM (Mixed form) on Riverbed of Malin River"… — environmental approval granted, 9.3 km away
- No Increase in Pollution Load Certificate for Proposed Addition of Alternative… — initial checks, 10.5 km away
- RBM (Mixed Form) Mining Project at (Khoh River) — environmental approval granted, 11.9 km away
- "RBM (MIXED FORM) Mining Project" at Gata No. – 70Mi, (Total area 1.265 Ha.) — environmental approval granted, 12.1 km away
More from Bharat Petroleum Corporation Limited (BPCL) in Bijnor
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — lapsed
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — forest land use approved
- Proposed Forest Land to be Diverted for Ex-Post-Facto Approval for Entry/Exit… — lapsed
- M/S Bharat Petroleum Corporation Limited Meerut By Proposed A retail outlet… — forest land use approved
6 Bharat Petroleum Corporation (BPCL) projects in Bijnor
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.