Quick answers
What is this project?
proposed "Ordinary Soil Excavation Project" at Gata No.- 554, 553, 354, 131, 130, 221, 215, 198 (Total Area – 2.494 Ha.) Village – Khagtaura, Tehsil- Amritpur, District- Farrukhabad Uttar Pradesh.Proponent: Shri Amrat(Total Area – 2.494 Ha.) is an approved mining project in Khaktaura, Amritpur, Farrukhabad, Uttar Pradesh. The site covers 6.2 acres.
Who is building it?
The applicant is Amrat.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 29 May 2025), as of 27 Nov 2026.
Where is it?
In Khaktaura, Amritpur, Farrukhabad, Uttar Pradesh.
How big is it?
It has a stated cost of ₹35 lakh and a site of 6.2 acres.
When was it filed?
The application was filed on 5 Apr 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 29 May 2025 |
| Application filed | 5 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Amrat |
| Land area | 6.2 acres (2.5 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Khaktaura |
| Taluk / tehsil | Amritpur |
| District | Farrukhabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02921 |
In context
13 applications in Farrukhabad since January 2022 are in the same category (Mining): 10 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 6.2 acres, this one is larger than 54% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Khaktaura, Amritpur, Farrukhabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.1530 Hectare of Protected Forest Land Under Social Forestry… — forest land use approved, 4.8 km away
- Proposed PF land for Entry and Exit of Nayara Energy Limited Retail Outlet on… — forest land use approved, 5.8 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — in-principle approval, conditions pending, 11.3 km away
- New 2-Lane/4-Lane Major bridges at Km 3+500 on Kali River, Km 39+840 on Ganga… — more information requested, 12.4 km away
- Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy… — forest land use approved, 12.8 km away
- Ordinary Soil Excavation Project — more information requested, 13.4 km away
- proposed "Ordinary Soil Excavation Project" at Gata No.- 128Mi, 129 (Total… — environmental approval granted, 14.3 km away
- Proposed "Ordinary Soil Mining Project" at Gata No. 131 by Shri Virendra Kumar — under environmental review, 16.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.